Summary for Test 2020-05-04-9-2
Test performed: AASHTO T30-19Project Information
Project Identifiers | Project ID: 66667 DEA: JMFPP EFIS: 0019000043 |
---|---|
DIST-CO-RTE-PM | 59--- |
Award Date | Not set |
Closeout Date | Not set |
Work Description | Special project for submitting Sample information for JMF Prequalification Program. |
Location Description | Not set |
QA Service Level | NOT VERIFIED |
Sample Information
Sample Taken Date | 05/04/2020 | Sample Unique Key | 9 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 05/04/2020 |
Sample type | Quality Control | A brief description of the sample | 1/2" Recycled Asphalt Pavement |
The quantity of what the sample constitutes | JMF Prequalification Program | From where was the sample collected | Manufacturer |
First name of sampler or witnessed by | Kevin | Last name of sampler or witnessed by | Owen |
Title of sampler | QC Supervisor | Telephone number of sampler | (209)481-2952 |
Laboratory sample identification | Linked DIME Sample ID | ||
The fabricator/manufacturer/facility name | Teichert Materials Vernalis | Transportation Laboratory (TL) Number | |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | Reclaimed Asphalt Pavement | RAP Source | Teichert Materials Vernalis |
---|---|---|---|
Aggregate Size | Unknown | Aggregate Source | Unknown |
RAP Stockpile | Static | Stockpile Size (tons) | Unknown |
Reclaimed Asphalt Pavement Mix Number | Not set |
Test Details
DIME Sample ID: 2020-05-04-9
DIME Test ID: 2020-05-04-9-2
Testing Lab: Teichert Materials - Sacramento
Test Method: AASHTO T30-19: Standard Method of Test for Mechanical Analysis of Extracted Aggregate (Mechanical Analysis)
Test Release Date: 2020-05-05
Test Results
Does this test use 1/4 sieve?:
Is an aggregate correction factor used?: No
Input Type: Calculated
Tester's full name: Eric Gifford
Date of test: 05/05/2020
Cumulative percent passing the 2 in. sieve: 100 %
Cumulative percent passing the 1 1/2 in. sieve: 100 %
Cumulative percent passing the 1 in. sieve: 100 %
Cumulative percent passing the 3/4 in. sieve: 100 %
Cumulative percent passing the 1/2 in. sieve: 97 %
Cumulative percent passing the 3/8 in. sieve: 92 %
Cumulative percent passing the #4 sieve: 69 %
Cumulative percent passing the #8 sieve: 53 %
Cumulative percent passing the #16 sieve: 37 %
Cumulative percent passing the #30 sieve: 28 %
Cumulative percent passing the #50 sieve: 20 %
Cumulative percent passing the #100 sieve: 13 %
Cumulative percent passing the #200 sieve: 8.9 %
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 5/5/2020 ✔