Summary for Test 2020-05-04-7-1

Test performed: AASHTO T27-14

Project Information

Project IdentifiersProject ID: 66667
DEA: JMFPP
EFIS: 0019000043
DIST-CO-RTE-PM59---
Award DateNot set
Closeout DateNot set
Work DescriptionSpecial project for submitting Sample information for JMF Prequalification Program.
Location DescriptionNot set
QA Service LevelNOT VERIFIED

Sample Information

Sample Taken Date05/04/2020 Sample Unique Key7
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing05/04/2020
Sample typeQuality Control A brief description of the sampleHydrated Lime
The quantity of what the sample constitutesJMF Prequalification Program From where was the sample collectedManufacturer
First name of sampler or witnessed byKevin Last name of sampler or witnessed byOwen
Title of samplerQC Supervisor Telephone number of sampler(209)481-2952
Laboratory sample identification Linked DIME Sample ID
The fabricator/manufacturer/facility nameTeichert Materials Vernalis Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name

Material Information

Material TypeAntistrip Additive Antistrip TypeLime - hydrated lime
Antistrip Additive Mix NumberNot set

Test Details

DIME Sample ID: 2020-05-04-7
DIME Test ID: 2020-05-04-7-1
Testing Lab: Teichert Materials - Sacramento
Test Method: AASHTO T27-14: Standard Method of Test for Sieve Analysis of Fine and Coarse Aggregates (Sieve Analysis)
Test Release Date: 2020-05-04

Test Results


What type of gradation is being tested?: HMA Gradation
Individual or cumulative mass retained on each sieve?: Cumulative Mass Retained
Does this test use 1/4 sieve? (question for HMA Gradation Type): No
Has the fine aggregate sample been reduced?: No
Input Type: Calculated
Tester's full name: Eric Gifford
Date of test: 05/04/2020
Cumulative percent passing the 1 1/2 in. sieve: 100 %
Cumulative percent passing the 1 in. sieve: 100 %
Cumulative percent passing the 3/4 in. sieve: 100 %
Cumulative percent passing the 1/2 in. sieve: 100 %
Cumulative percent passing the 3/8 in. sieve: 100 %
Cumulative percent passing the #4 sieve: 100 %
Cumulative percent passing the #8 sieve: 100 %
Cumulative percent passing the #16 sieve: 100 %
Cumulative percent passing the #30 sieve: 100 %
Cumulative percent passing the #50 sieve: 100 %
Cumulative percent passing the #100 sieve: 100 %
Cumulative percent passing the #200 sieve: 100 %
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 5/4/2020