Summary for Test 2020-04-14-23-2
Test performed: CTM 217-June 2011Project Information
Project Identifiers | Project ID: 211260 DEA: 072159U4 EFIS: 0715000160 |
---|---|
DIST-CO-RTE-PM | 07-LA,ORA-5-0.0/1.5, 44.3/44.4 |
Award Date | 05/27/2016 |
Closeout Date | 08/01/2023 |
Work Description | CONSTRUCT HOV LANES AND MIX FLOW LANES. |
Location Description | LOS ANGELES AND ORANGE COUNTIES IN BUENA PARK, LA MIRADA, CERRITOS AND SANTA FE SPRINGS FROM ARTESIA BOULEVARD UNDERCROSSING TO NORTH FORK COYOTE CREEK |
QA Service Level | 1 (Verified on 03/16/2016) |
Sample Information
Sample Taken Date | 04/14/2020 | Sample Unique Key | 23 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 04/15/2020 |
Sample type | Acceptance | A brief description of the sample | WCS for PCC Acceptance |
The quantity of what the sample constitutes | 3 containers | From where was the sample collected | Manufacturer |
First name of sampler or witnessed by | Zaid | Last name of sampler or witnessed by | Abdelkhalq |
Title of sampler | TET | Telephone number of sampler | |
Laboratory sample identification | 9749 | Linked DIME Sample ID | |
The fabricator/manufacturer/facility name | Hanson Irwindale | Transportation Laboratory (TL) Number | TNT1 |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | Aggregate | Source Identification (SMARA, name of Pit or Job Site) | 91-19-0025::IRWINDALE |
---|---|---|---|
The fabricator's/manufacturer's product name for the sample | Unknown | The fabricator/manufacturer designation for the sample | Unknown |
The plant number | Unknown | A detailed description of where the material sample was collected | Unknown |
Where the material sample would have been placed if not sampled | Unknown | Primary Aggregate Nominal Size | fine |
The concrete mix design number | HRC14058 | Lot number | Unknown |
Sublot number | Unknown | Aggregate Mix Number | Not set |
Test Details
DIME Sample ID: 2020-04-14-23
DIME Test ID: 2020-04-14-23-2
Testing Lab: CT D08 - Fontana Southern Regional Laboratory
Test Method: CTM 217-June 2011: Method of Test for Sand Equivalent
Test Release Date: 2020-04-29
Test Results
Number of tests: 2
Input Type: Calculated
Tester's full name: Larry Diaz
Date of test: 04/24/2020
Temperature correction: 0
Temperature of solution: 72
Clay reading (test 1): 4.8
Sand reading (test 1): 3.8
Clay reading (test 2): 5
Sand reading (test 2): 4
Sand equivalent (test 1): 80
Sand equivalent (test 2): 80
Sand equivalent before temperature correction: 80
Sand equivalent after temperature correction: 80
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 4/29/2020 ✔