Summary for Test 2020-04-14-18-5
Test performed: CTM 670-December 2013Project Information
Project Identifiers | Project ID: 213682 DEA: 11430184 EFIS: 1117000215 |
---|---|
DIST-CO-RTE-PM | 11-SD-805-8.4/8.8 |
Award Date | 12/13/2018 |
Closeout Date | 09/14/2023 |
Work Description | Bridge widening, HMA, barrier, drainage, RCP, and landscape work near Sweetwater River Bridge in Chula Vista. Widening of Sweetwater River Bridge in Chula Vista on 805. |
Location Description | Near Sweetwater River Bridge in Chula Vista on 805. |
QA Service Level | 1 (Verified on 06/01/2020) |
Sample Information
Sample Taken Date | 04/14/2020 | Sample Unique Key | 18 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 04/22/2020 |
Sample type | Quality Assurance | A brief description of the sample | HRC Couplers |
The quantity of what the sample constitutes | 8 | From where was the sample collected | Job Site |
First name of sampler or witnessed by | Tom | Last name of sampler or witnessed by | Galvin |
Title of sampler | Telephone number of sampler | ||
Laboratory sample identification | Linked DIME Sample ID | ||
The fabricator/manufacturer/facility name | Flatiron | Transportation Laboratory (TL) Number | C604515 C604516 |
Inspector Lot Number from the Transportation Laboratory (TL) Form | NA | Structure unique identifier | |
Structure name |
Material Information
Material Type | SMTL TM5 - Couplers | Production or Authorization Testing | Authorization Testing |
---|---|---|---|
Service or Ultimate | Service | Material Standard Code | ASTM A706 |
Material Grade | 60 | Rebar Manufacturer | Nucor |
Coupler Manufacturer | HRC | Intermediate Assembler or Fabricator | Unknown |
Rebar Size | #11 | Coupler Model | HRC 500/510 |
Coating Standards | Uncoated | Shape of Rebar | Straight |
Rebar Hoop Diameter | Unknown | Rebar Hoop Fabricator | Unknown |
Coupler Component Heat/Lot Number(s) | 62147303 74117089 | Rebar Heat Number(s) | 1201003835 |
Rebar Size 2 | Coupler Unique ID | Not set |
Test Details
DIME Sample ID: 2020-04-14-18
DIME Test ID: 2020-04-14-18-5
Testing Lab: CT HQ - Sacramento Structural Materials Testing Laboratory
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Cyclical/Fatique Tensile with Slip)
Test Release Date: 2020-04-23
Test Results
Number of Samples Tested: 1
Input Type: Measured
Tester's full name: bewing
Date of test: 04/22/2020
UTM: 2000kip
Temperature: 72.00 f
Halo ID:
Num | Sample | Number of Cycles | Size | Mfg. Lot Number(s) | Slip (inch) | Area (sqin) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By |
---|---|---|---|---|---|---|---|---|---|---|
1 | 5 | No. 11/36mm | 2 | 0 | 1.56 | 153344 | 98297 | Service Splice | bewing |
General comments (publicly viewable) (Max 1000 characters): Service Splice
Test Graph
Source: Bluehill Data Point File
WARNING: position or load not found in data points imported from Instron machine.
Test was verified on 4/23/2020 ✔