Summary for Test 2020-02-20-6-1
Test performed: ASTM C39-17aProject Information
Project Identifiers | Project ID: 212324 DEA: 033F5104 EFIS: 0313000020 |
---|---|
DIST-CO-RTE-PM | 03-YUB-20-R18.1/R20.1 |
Award Date | 10/31/2019 |
Closeout Date | 08/03/2023 |
Work Description | Construct bridge, realign curve & widen shoulders. |
Location Description | Construction on state highway in Yuba County near Smartsville from the Yuba River Bridge to 0.3 mile east of Smartsville Road. |
QA Service Level | 1 (Verified on 02/27/2020) |
Sample Information
Sample Taken Date | 02/20/2020 | Sample Unique Key | 6 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 02/24/2020 |
Sample type | Quality Assurance | A brief description of the sample | 6x12 concrete cylinders |
The quantity of what the sample constitutes | 5 cylinders | From where was the sample collected | Job Site |
First name of sampler or witnessed by | kaveh | Last name of sampler or witnessed by | aladini |
Title of sampler | Telephone number of sampler | ||
Laboratory sample identification | Linked DIME Sample ID | ||
The fabricator/manufacturer/facility name | Collected at jobsite | Transportation Laboratory (TL) Number | 78809 |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | Concrete | The concrete mix design number | Z5754298 |
---|---|---|---|
The truck number from where the sample was collected | Unknown | The batch plant ticket number from where the sample was collected | Unknown |
Concrete batch plant | Unknown | The fabricator/manufacturer designation for the sample | Unknown |
A detailed description of where the material sample was collected | CIDH TRIAL BATCH | Where the material sample would have been placed if not sampled | Unknown |
From Lot No. | Unknown | Bag Lot No. | Unknown |
Test Details
DIME Sample ID: 2020-02-20-6
DIME Test ID: 2020-02-20-6-1
Testing Lab: CT HQ - Sacramento Concrete Testing Laboratory
Test Method: ASTM C39-17a: Standard Test Method for Compressive Strength of Cylindrical Concrete Specimens
Test Release Date: 2020-03-19
Test Results
Unit system used?: US Units
Number of specimens: 5
Test performed: With no density determined
Input Type: Measured
Tester's full name: LMC
Date of test: 03/19/2020
Capped in accordance with?: ASTM C617/CTM521
Average diameter of cylinder 1: 6.00 in
Average diameter of cylinder 2: 6.03 in
Average diameter of cylinder 3: 6.01 in
Average diameter of cylinder 4: 6.01 in
Average diameter of cylinder 5: 5.99 in
Maximum load on cylinder 1: 157607 lb
Maximum load on cylinder 2: 136169 lb
Maximum load on cylinder 3: 159945 lb
Maximum load on cylinder 4: 158735 lb
Maximum load on cylinder 5: 157719 lb
Type of fracture pattern of cylinder 1: 1
Type of fracture pattern of cylinder 2: 4
Type of fracture pattern of cylinder 3: 1
Type of fracture pattern of cylinder 4: 4
Type of fracture pattern of cylinder 5: 4
Comment on any defect in either specimen or caps (Max 250 Characters): no data
Correction factor for cylinder 1: 1
Correction factor for cylinder 2: 1
Correction factor for cylinder 3: 1
Correction factor for cylinder 4: 1
Correction factor for cylinder 5: 1
Age of specimen: 28 days
Age of specimen in hours: no data
Cross sectional area of cylinder 1: 28.26 in^2
Cross sectional area of cylinder 2: 28.54 in^2
Cross sectional area of cylinder 3: 28.35 in^2
Cross sectional area of cylinder 4: 28.35 in^2
Cross sectional area of cylinder 5: 28.17 in^2
Compressive strength of cylinder 1: 5577.0 psi
Compressive strength of cylinder 2: 4771.2 psi
Compressive strength of cylinder 3: 5641.8 psi
Compressive strength of cylinder 4: 5599.1 psi
Compressive strength of cylinder 5: 5598.8 psi
Compressive strength (to nearest 10 psi): 5440 psi
General comments (publicly viewable) (Max 1000 characters):
Test Graph
Source: Partner Data Point FileTest graph for Cylinder Code 1 of 5
Source: Partner Data Point File
Test graph for Cylinder Code 2 of 5
Source: Partner Data Point File
Test graph for Cylinder Code 3 of 5
Source: Partner Data Point File
Test graph for Cylinder Code 4 of 5
Source: Partner Data Point File
Test graph for Cylinder Code 5 of 5
Test was verified on 3/19/2020 ✔