Summary for Test 2020-01-30-17-3

Test performed: AASHTO T269-14

Project Information

Project IdentifiersProject ID: 214634
DEA: 051M2404
EFIS: 0519000085
DIST-CO-RTE-PM05-SB-101-21.8/22.0
Award DateNot set
Closeout DateNot set
Work DescriptionGoleta Cross Slope Correction
Location DescriptionNot set
QA Service Level1 (Verified on 02/20/2020)

Sample Information

Sample Taken Date01/30/2020 Sample Unique Key17
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing01/31/2020
Sample typeVerification A brief description of the sample12 x 20 lbs boxes
The quantity of what the sample constitutesVerification Testing From where was the sample collectedManufacturer
First name of sampler or witnessed bySal Last name of sampler or witnessed byZamora
Title of sampler Telephone number of sampler
Laboratory sample identificationD5 20-J-001 Linked DIME Sample ID
The fabricator/manufacturer/facility nameCalPortland Garey Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name

Material Information

Material TypeHot Mix Asphalt HMA TypeType A HMA
HMA Grading3/4 inch Lot numberUnknown
Sublot numberUnknown HMA Mix NumberNot set

Test Details

DIME Sample ID: 2020-01-30-17
DIME Test ID: 2020-01-30-17-3
Testing Lab: CT D05 - San Luis Obispo District Laboratory
Test Method: AASHTO T269-14: Standard Method of Test for Percent Air Voids in Compacted Dense and Open Asphalt Mixtures (Air Void)
Test Release Date: 2020-02-12

Test Results


Number of tests: 3
Input Type: Measured
Tester's full name: Eric Atkins
Date of test: 02/12/2020
123
2.265 2.266 2.267
2.386

5.1 %

5.0 %

5.0 %

5.0 %
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 2/12/2020