Summary for Test 2020-01-15-17-3
Test performed: CTM 670-December 2013Project Information
Project Identifiers | Project ID: 214245 DEA: 11404604 EFIS: 1114000049 |
---|---|
DIST-CO-RTE-PM | 11-SD-56-5.6 |
Award Date | 10/21/2019 |
Closeout Date | 03/01/2022 |
Work Description | CONSTRUCT 2 LANES, STRUCTURAL CONCRETE BRIDGE. |
Location Description | SAN DIEGO COUNTY IN SAN DIEGO AT 0.5 MILE WEST OF CAMINO DEL SUR UNDERCROSSING |
QA Service Level | 1 (Verified on 12/23/2019) |
Sample Information
Sample Taken Date | 01/15/2020 | Sample Unique Key | 17 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 02/05/2020 |
Sample type | Quality Assurance | A brief description of the sample | Coupler |
The quantity of what the sample constitutes | 4 | From where was the sample collected | Job Site |
First name of sampler or witnessed by | Reza | Last name of sampler or witnessed by | Rafie |
Title of sampler | Telephone number of sampler | ||
Laboratory sample identification | Linked DIME Sample ID | ||
The fabricator/manufacturer/facility name | BarSplice CMC | Transportation Laboratory (TL) Number | C690861 |
Inspector Lot Number from the Transportation Laboratory (TL) Form | NA | Structure unique identifier | |
Structure name |
Material Information
Material Type | SMTL TM5 - Couplers | Production or Authorization Testing | Production Testing |
---|---|---|---|
Service or Ultimate | Service | Material Standard Code | ASTM A706 |
Material Grade | 60 | Rebar Manufacturer | CMC |
Coupler Manufacturer | BarSplice | Intermediate Assembler or Fabricator | Unknown |
Rebar Size | 7 | Coupler Model | DBL BRL Zap Screwlok |
Coating Standards | Uncoated | Shape of Rebar | Straight |
Rebar Hoop Diameter | Unknown | Rebar Hoop Fabricator | Unknown |
Coupler Component Heat/Lot Number(s) | 9065 | Rebar Heat Number(s) | 9001712 |
Rebar Size 2 | Coupler Unique ID | Not set |
Test Details
DIME Sample ID: 2020-01-15-17
DIME Test ID: 2020-01-15-17-3
Testing Lab: CT HQ - Sacramento Structural Materials Testing Laboratory
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile)
Test Release Date: 2020-02-06
Test Results
Number of Samples: 1
Input Type: Measured
Tester's full name: bewing
Date of test: 02/05/2020
UTM: 400kip
Temperature: 72 f
Num | Sample | Mfg. Lot Number(s) | Size | Area (sqin) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By |
---|---|---|---|---|---|---|---|---|
1 | 3 | 1 | 7/22mm | 0.6 | 61069.95 | 101783 | Service Splice | bewing |
General comments (publicly viewable) (Max 1000 characters): Service Splice
Test Graph
Source: Bluehill Data Point FileTest graph for the Sample
Test was verified on 2/6/2020 ✔