Summary for Test 2019-12-12-21-2

Test performed: CTM 205-December 2010

Project Information

Project IdentifiersProject ID: 7613
DEA: 071218W4
EFIS: 0700021119
DIST-CO-RTE-PM07-LA-5-29.4/31.6
Award Date11/29/2012
Closeout Date07/31/2023
Work DescriptionREALIGN ROUTE 5 AND RAILROAD TRACKS AND RECONFIGURE ON- AND OFF-RAMPS.
Location DescriptionLOS ANGELES COUNTY IN BURBANK FROM WEST MAGNOLIA BOULEVARD OVERCROSSING TO 0.3 MILE NORTH OF BUENA VISTA STREET/WINONA AVENUE UNDERCROSSING
QA Service Level1 (Verified on 10/08/2012)

Sample Information

Sample Taken Date12/12/2019 Sample Unique Key21
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing12/16/2019
Sample typeVerification A brief description of the sample3/4 HMA-A R10
The quantity of what the sample constitutesJMF 12 Bags, 1 Can From where was the sample collectedManufacturer
First name of sampler or witnessed byVulcan Sun Valley Last name of sampler or witnessed byQC
Title of sampler Telephone number of sampler
Laboratory sample identification0722A-19 Linked DIME Sample ID
The fabricator/manufacturer/facility nameVulcan Sun Valley Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name

Material Information

Material TypeAggregate Source Identification (SMARA, name of Pit or Job Site)91-19-0019, 91-19-0021
The fabricator's/manufacturer's product name for the sample3/4 HMA-A R10 The fabricator/manufacturer designation for the sample220805 SVA VLO
The plant numberUnknown A detailed description of where the material sample was collectedBelt Cut at Vulcan Sun Valley Plant
Where the material sample would have been placed if not sampledUnknown Primary Aggregate Nominal Size3/4 inch
The concrete mix design numberUnknown Lot numberUnknown
Sublot numberUnknown Aggregate Mix NumberNot set

Test Details

DIME Sample ID: 2019-12-12-21
DIME Test ID: 2019-12-12-21-2
Testing Lab: CT D08 - Fontana Southern Regional Laboratory
Test Method: CTM 205-December 2010: Method of Test for Determining Percentage of Crushed Particles
Test Release Date: 2020-03-17

Test Results


Will you be using 1/4 in. x No. 4 sieve?: No
Input Type: Calculated
Tester's full name: Satish Jain
Date of test: 12/24/2019
Percent Coarse Crushed: 98 %
Percent Fine Crushed: 100 %
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 3/17/2020