Test 2019-09-09-18-2 (AASHTO T30-15) Summary

Project Information
Project IdentifiersProject ID: 214236
DEA: 024H3804
EFIS: 0218000112
MINOR: 02A1831
DIST-CO-RTE-PM02-PLU-36-6.6/6.6001
Work DescriptionChester MS Infiltration Trench Project
Location DescriptionStorm Water Improvements in Plumas County about 1.9 miles West of Chester at the Chester Maintenance Station.
Sample Information
Sample Taken Date9/9/2019 Sample Unique Key18
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing9/10/2019
Sample typeVerification A brief description of the sampleCombined 1/2-inch RAP
The quantity of what the sample constitutesJMF Verification From where was the sample collectedManufacturer
First name of sampler or witnessed byRobert Last name of sampler or witnessed byNixa
Title of sampler Laboratory sample identificationD78165B
The fabricator/manufacturer/facility nameSierra Cascade Aggregate and Asphalt Products Transportation Laboratory (TL) Number847546
Inspector Lot Number from the Transportation Laboratory (TL) FormJMF Structure unique identifier
Structure name
Material Information
Material TypeReclaimed Asphalt Pavement RAP SourceSierra Cascade
Aggregate SizeCombined Aggregate SourceUnknown
RAP StockpileStatic Stockpile Size (tons)Unknown
JMF Verification ID JMF3513-2019-89
Test Details
DIME Sample ID: 2019-09-09-18
DIME Test ID: 2019-09-09-18-2
Testing Lab: CT D02 - North Region Materials Lab
Test Method: AASHTO T30-15: Standard Method of Test for Mechanical Analysis of Extracted Aggregate (Mechanical Analysis)
Test Release Date: 2019-12-18
Test Results

Input Type: Calculated
Tester's full name: Terry McCormick
Date of test: 09/11/2019
Cumulative percent passing the 2 in. sieve:100 %
Cumulative percent passing the 1 1/2 in. sieve:100 %
Cumulative percent passing the 1 in. sieve:100 %
Cumulative percent passing the 3/4 in. sieve:100 %
Cumulative percent passing the 1/2 in. sieve:98.8 %
Cumulative percent passing the 3/8 in. sieve:93.8 %
Cumulative percent passing the 1/4 in. sieve:82.3 %
Cumulative percent passing the #4 sieve:73.4 %
Cumulative percent passing the #8 sieve:54.1 %
Cumulative percent passing the #16 sieve:40 %
Cumulative percent passing the #30 sieve:29.9 %
Cumulative percent passing the #50 sieve:21.6 %
Cumulative percent passing the #100 sieve:15.2 %
Cumulative percent passing the #200 sieve:11.07 %
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 12/18/2019