Summary for Test 2019-10-28-25-9
Test performed: CTM 202-November 2011Project Information
Project Identifiers | Project ID: 213741 DEA: 07325704 EFIS: 0716000089 |
---|---|
DIST-CO-RTE-PM | 07-LA-5-1.7 |
Award Date | Not set |
Closeout Date | Not set |
Work Description | BUILDING CONSTRUCTION IN LOS ANGELES COUNTY IN SANTA FE SPRINGS AT 14044 FREEWAY DRIVE. |
Location Description | Santa Fe Springs, At 14044 Freeway Drive. |
QA Service Level | 1 (Verified on 07/08/2019) |
Sample Information
Sample Taken Date | 10/28/2019 | Sample Unique Key | 25 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 10/31/2019 |
Sample type | Verification | A brief description of the sample | 1/2 WMA-A-SP R25 |
The quantity of what the sample constitutes | JMF 6 Bags | From where was the sample collected | Manufacturer |
First name of sampler or witnessed by | RJ Noble Orange | Last name of sampler or witnessed by | QC |
Title of sampler | Telephone number of sampler | ||
Laboratory sample identification | 0669A-19 | Linked DIME Sample ID | |
The fabricator/manufacturer/facility name | Hanson Aggregates, Chandler Aggregates | Transportation Laboratory (TL) Number | |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | Aggregate | Source Identification (SMARA, name of Pit or Job Site) | 91-33-0035, 91-33-0014 |
---|---|---|---|
The fabricator's/manufacturer's product name for the sample | 1/2 WMA-A-SP R25 | The fabricator/manufacturer designation for the sample | 40R2507SPWEO |
The plant number | Unknown | A detailed description of where the material sample was collected | Belt Cut at RJ Noble Orange Plant |
Where the material sample would have been placed if not sampled | Unknown | Primary Aggregate Nominal Size | 1/2 inch |
The concrete mix design number | Unknown | Lot number | Unknown |
Sublot number | Unknown | Aggregate Mix Number | Not set |
Test Details
DIME Sample ID: 2019-10-28-25
DIME Test ID: 2019-10-28-25-9
Testing Lab: CT D08 - Fontana Southern Regional Laboratory
Test Method: CTM 202-November 2011: Method of Test for Sieve Analysis of Fine and Coarse Aggregates
Test Release Date: 2020-05-07
Test Results
What size aggregate is being tested?: Combined Gradation
Individual or cumulative mass retained on each sieve?: Cumulative Mass Retained
For Combined Gradation only, has the fine aggregate sample been reduced?: No
For Combined Gradation only, use #40 Sieve?: No
Input Type: Calculated
Tester's full name: Danilo Ferrer
Date of test: 11/04/2019
Cumulative percent passing the 3 in. sieve: 100 %
Cumulative percent passing the 2 1/2 in. sieve: 100 %
Cumulative percent passing the 2 in. sieve: 100 %
Cumulative percent passing the 1 1/2 in. sieve: 100 %
Cumulative percent passing the 1 in. sieve: 100 %
Cumulative percent passing the 3/4 in. sieve: 100 %
Cumulative percent passing the 1/2 in. sieve: 99 %
Cumulative percent passing the 3/8 in. sieve: 88 %
Cumulative percent passing the #4 sieve: 60 %
Cumulative percent passing the #8 sieve: 43 %
Cumulative percent passing the #16 sieve: 32 %
Cumulative percent passing the #30 sieve: 24 %
Cumulative percent passing the #50 sieve: 17 %
Cumulative percent passing the #100 sieve: 12 %
Cumulative percent passing the #200 sieve: 8 %
General comments (publicly viewable) (Max 1000 characters): RAP Gradation After ignition Oven
Test was verified on 5/7/2020 ✔