Test 2019-09-04-7-3 (ASTM C1038-14b) Summary

Project Information
Project IdentifiersProject ID: 214029
DEA: 07301104
EFIS: 0714000009
DIST-CO-RTE-PM07-LA-60,710-710-R2.8/11.8, 24.1/25.1
Work DescriptionRoadway ex, place jointed plain concrete pavement & concrete barrieres
Location DescriptionIn Los Angeles County at avocado Heights on Route 60 from 0.5 Mile west of Route 60/710 Separation to Route 60/605 Separation AND on Route 710 from 0.5 miles south of Route 710/60 Separation to 0.5 mile north of Route 710/60 Separation.
Sample Information
Sample Taken Date9/4/2019 Sample Unique Key7
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing9/6/2019
Sample typeVerification A brief description of the sampleType III Cement
The quantity of what the sample constitutes15 lbs From where was the sample collectedJob Site
First name of sampler or witnessed byNA Last name of sampler or witnessed byNA
Title of sampler Laboratory sample identificationCM194902
The fabricator/manufacturer/facility nameUnknown Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name
Material Information
Material TypeCementitious BrandMitsubishi
MillCushenbury Type of Cementitious MaterialType II Cement
Test Details
DIME Sample ID: 2019-09-04-7
DIME Test ID: 2019-09-04-7-3
Testing Lab: CT HQ - Sacramento Cement Testing Laboratory
Test Method: ASTM C1038-14b: Standard Test Method for Expansion of Hydraulic Cement Mortar Bars Stored in Water (Cement Mortar Bars)
Test Release Date: 2019-10-08
Test Results

Input Type: Measured
Tester's full name: Benjamin Lenz
Date of test: 09/23/2019
Specimen A Initial measurement at 24 hours: 0.2963 in
Specimen B Initial measurement at 24 hours: 0.2814 in
Specimen C Initial measurement at 24 hours: 0.329 in
Specimen D Initial measurement at 24 hours: 0.278 in
Specimen A Final measurement at 14 days: 0.2968 in
Specimen B Final measurement at 14 days: 0.2819 in
Specimen C Final measurement at 14 days: 0.3294 in
Specimen D Final measurement at 14 days: 0.2785 in
The average length of change of the four specimens:0.005 %
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 10/08/2019