Test 2019-09-20-2-5 (CTM 670-December 2013) Summary

Project Information
Project IdentifiersProject ID: 213856
DEA: 112888U4
EFIS: 1118000199
DIST-CO-RTE-PM11-SD-11,125,905-Various
Work DescriptionCONSTRUCT FREEWAY TO FREEWAY CONNECTORS AND 4-LANE HIGHWAY FACILITY
Location DescriptionSAN DIEGO COUNTY AT VARIOUS LOCATIONS
Sample Information
Sample Taken Date9/20/2019 Sample Unique Key2
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing9/23/2019
Sample typeQuality Assurance A brief description of the sampleCouplers
The quantity of what the sample constitutes8 From where was the sample collectedManufacturer
First name of sampler or witnessed byTuam Last name of sampler or witnessed byTran
Title of sampler Laboratory sample identification
The fabricator/manufacturer/facility nameHRC Transportation Laboratory (TL) NumberNA
Inspector Lot Number from the Transportation Laboratory (TL) FormNA Structure unique identifier
Structure name
Material Information
Material TypeSMTL TM5 - Couplers Production or Authorization TestingProduction Testing
Service or UltimateUltimate Material Standard CodeASTM A706
Material Grade60 Rebar ManufacturerCMC Steel
Coupler ManufacturerHRC Intermediate Assembler or FabricatorUnknown
Rebar Size14 Coupler ModelHRC 500/510
Coating StandardsUncoated Shape of RebarStraight
Rebar Hoop DiameterUnknown Rebar Hoop FabricatorUnknown
Coupler Component Heat/Lot Number(s)74113607, 73112054, 74112219, 62144586 Rebar Heat Number(s)033695
Rebar Size 2
Test Details
DIME Sample ID: 2019-09-20-2
DIME Test ID: 2019-09-20-2-5
Testing Lab: CT HQ - Sacramento Structural Materials Testing Laboratory
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Cyclical/Fatique Tensile with Slip)
Test Release Date: 2019-09-25
Test Results

Number of Samples Tested: 1
Input Type: Measured
Tester's full name: bewing
Date of test: 09/23/2019
UTM:2000kip
Temperature:72.00 f
Halo ID:
NumSampleNumber of CyclesSizeMfg. Lot Number(s)Slip (inch)Area (sqin)Peak Load (lbf)Peak Stress (psi)CommentsTested By
12No. 14/43mm602.2521555695803Bar Broke, Ok Neckingbewing

General comments (publicly viewable) (Max 250 characters): Bar Broke, Ok Necking
Test Graph
Source: Bluehill Data Point File
WARNING: position or load not found in data points imported from Instron machine.

Test was verified on 09/25/2019