Test 2019-06-18-17-2 (CTM 202-November 2011) Summary

Project Information
Project IdentifiersProject ID: 214338
DEA: 080G7904
EFIS: 0814000176
DIST-CO-RTE-PM08-SBD,RIV-71-R0.0/R8.5,R0.0/G3.0
Work DescriptionINSTALL RMS,CCTV,CMS,VDS & FIBER OPTIC COMM SYSTEM (PSR ONLY
Location DescriptionSAN BERNARDINO AND RIVERSIDE COUNTIES IN AND NEAR CHINO AND CHINO HILLS FROM LOS ANGELES COUNTY LINE TO ROUTE 91
Sample Information
Sample Taken Date6/18/2019 Sample Unique Key17
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing8/8/2019
Sample typePer Request A brief description of the sampleSoil
The quantity of what the sample constitutes1 bag From where was the sample collectedJob Site
First name of sampler or witnessed byHakima Last name of sampler or witnessed byHossainzadeh
Title of samplerTE Laboratory sample identification8678
The fabricator/manufacturer/facility nameCaltrans Transportation Laboratory (TL) NumberC-1
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name
Material Information
Material TypeSoil The fabricator's/manufacturer's product name for the sampleUnknown
The fabricator/manufacturer designation for the sampleUnknown A detailed description of where the material sample was collectedBoring Number RC-19-003, Sample No. 1
Where the material sample would have been placed if not sampledUnknown
Test Details
DIME Sample ID: 2019-06-18-17
DIME Test ID: 2019-06-18-17-2
Testing Lab: CT - Southern Regional Laboratory
Test Method: CTM 202-November 2011: Method of Test for Sieve Analysis of Fine and Coarse Aggregates
Test Release Date: 2019-09-20
Test Results

What size aggregate is being tested?: Combined Gradation
Individual or cumulative mass retained on each sieve?: Cumulative Mass Retained
Input Type: Calculated
Tester's full name: Kiet Phan
Date of test: 08/10/2019
Cumulative percent passing the 3 in. sieve:100 %
Cumulative percent passing the 2 1/2 in. sieve:100 %
Cumulative percent passing the 2 in. sieve:100 %
Cumulative percent passing the 1 1/2 in. sieve:100 %
Cumulative percent passing the 1 in. sieve:100 %
Cumulative percent passing the 3/4 in. sieve:98 %
Cumulative percent passing the 1/2 in. sieve:95 %
Cumulative percent passing the 3/8 in. sieve:94 %
Cumulative percent passing the #4 sieve:92 %
Cumulative percent passing the #8 sieve:91 %
Cumulative percent passing the #16 sieve:87 %
Cumulative percent passing the #30 sieve:78 %
Cumulative percent passing the #50 sieve:59 %
Cumulative percent passing the #100 sieve:30 %
Cumulative percent passing the #200 sieve:20 %
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 09/20/2019