Test 2019-05-14-10-11 (CTM 203-February 2008) Summary

Project Information
Project IdentifiersProject ID: 214341
DEA: 081J2004
EFIS: 0817000237
DIST-CO-RTE-PM08---
Work DescriptionEXTEND DECELARATION LANE
Location DescriptionNot set
Sample Information
Sample Taken Date5/14/2019 Sample Unique Key10
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing6/12/2019
Sample typePer Request A brief description of the sampleSoil
The quantity of what the sample constitutes1 bag From where was the sample collectedJob Site
First name of sampler or witnessed byShadi Last name of sampler or witnessed byDweab
Title of samplerTE Laboratory sample identification8611
The fabricator/manufacturer/facility nameCaltrans Transportation Laboratory (TL) NumberS-17300-3
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name
Material Information
Material TypeSoil The fabricator's/manufacturer's product name for the sampleUnknown
The fabricator/manufacturer designation for the sampleUnknown A detailed description of where the material sample was collectedR-19-004, I-15 SB, PM 21.5-22.0
Where the material sample would have been placed if not sampledUnknown
Test Details
DIME Sample ID: 2019-05-14-10
DIME Test ID: 2019-05-14-10-11
Testing Lab: CT - Southern Regional Laboratory
Test Method: CTM 203-February 2008: Mechanical Analysis of Soils
Test Release Date: 2019-09-20
Test Results

What size aggregate is being tested?: Fine Aggregate
Individual or cumulative mass retained on each sieve?: Cumulative Mass Retained
Input Type: Calculated
Tester's full name: Tess Perez/Kiet Phan
Date of test: 07/17/2019
Cumulative percent passing the 3/8 in. sieve:96 %
Cumulative percent passing the #4 sieve:93 %
Cumulative percent passing the #8 sieve:86 %
Cumulative percent passing the #16 sieve:77 %
Cumulative percent passing the #30 sieve:66 %
Cumulative percent passing the #50 sieve:54 %
Cumulative percent passing the #100 sieve:42 %
Cumulative percent passing the #200 sieve:33 %
General comments (publicly viewable) (Max 1000 characters): Hydrometer Result: Combined percent in suspension: 1 hour=12%, 24 hours=5%

Test was verified on 09/20/2019