Summary for Test 2019-07-13-2-7
Test performed: CTM 217-June 2011Project Information
Project Identifiers | Project ID: 212888 DEA: 07202124 EFIS: 0700020870 |
---|---|
DIST-CO-RTE-PM | 07-LA-710-20.9/24.6 |
Award Date | 02/16/2018 |
Closeout Date | 05/04/2022 |
Work Description | PAVEMENT REHABILITATION AND BRIDGE WIDENING |
Location Description | LOS ANGELES COUNTY IN AND NEAR BELL, VERNON, AND CITY OF COMMERCE, FROM 0.2 MILE SOUTH OF SLAUSON AVENUE OVERCROSSING TO 0.1 MILE NORTH OF THIRD STREET OVERCROSSING |
QA Service Level | 1 (Verified on 03/29/2018) |
Sample Information
Sample Taken Date | 07/13/2019 | Sample Unique Key | 2 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 07/17/2019 |
Sample type | Per Request | A brief description of the sample | Class 3 Agg Base |
The quantity of what the sample constitutes | 2 bags | From where was the sample collected | Job Site |
First name of sampler or witnessed by | Unknown | Last name of sampler or witnessed by | Unknown |
Title of sampler | Material Tester | Telephone number of sampler | |
Laboratory sample identification | 8649 | Linked DIME Sample ID | |
The fabricator/manufacturer/facility name | Caltrans | Transportation Laboratory (TL) Number | C904629 |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | Aggregate | Source Identification (SMARA, name of Pit or Job Site) | Unknown |
---|---|---|---|
The fabricator's/manufacturer's product name for the sample | Unknown | The fabricator/manufacturer designation for the sample | Unknown |
The plant number | Unknown | A detailed description of where the material sample was collected | Roadway Sta 20.9-24.6 |
Where the material sample would have been placed if not sampled | Unknown | Primary Aggregate Nominal Size | 1 inch |
The concrete mix design number | Unknown | Lot number | Unknown |
Sublot number | Unknown | Aggregate Mix Number | Not set |
Test Details
DIME Sample ID: 2019-07-13-2
DIME Test ID: 2019-07-13-2-7
Testing Lab: CT D08 - Fontana Southern Regional Laboratory
Test Method: CTM 217-June 2011: Method of Test for Sand Equivalent
Test Release Date: 2019-09-17
Test Results
Number of tests: 2
Input Type: Calculated
Tester's full name: Kiet Phan
Date of test: 07/24/2019
Temperature correction: 0
Temperature of solution: 73
Clay reading (test 1): 6.9
Sand reading (test 1): 3.4
Clay reading (test 2): 7
Sand reading (test 2): 3.2
Sand equivalent (test 1): 50
Sand equivalent (test 2): 46
Sand equivalent before temperature correction: 48
Sand equivalent after temperature correction: 48
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 9/17/2019 ✔