Test 2019-07-09-10-8 (CTM 301-March 2000) Summary

Project Information
Project IdentifiersProject ID: 213608
DEA: 09364704
DIST-CO-RTE-PM09-MNO-395-60.0/69.9
Work DescriptionCONSTRUCT MIDWEST GUARD RAIL.
Location DescriptionMONO COUNTY ABOUT 6 MILES SOUTH OF BRIDGEPORT FROM CONWAY RANCH ROAD TO ROUTE 270
Sample Information
Sample Taken Date7/9/2019 Sample Unique Key10
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing7/17/2019
Sample typePer Request A brief description of the sampleImport Borrow for use in Backfill
The quantity of what the sample constitutes1 Bucket From where was the sample collectedSource
First name of sampler or witnessed byUnknown Last name of sampler or witnessed byUnknown
Title of samplerQA Material Tester Laboratory sample identification8648
The fabricator/manufacturer/facility nameGranite Construction Transportation Laboratory (TL) NumberC661278
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name
Material Information
Material TypeAggregate Source Identification (SMARA or name of Pit)Unknown
The fabricator's/manufacturer's product name for the sampleUnknown The fabricator/manufacturer designation for the sampleUnknown
The plant numberUnknown A detailed description of where the material sample was collectedStockpile at plant
Where the material sample would have been placed if not sampledUnknown Primary Aggregate Nominal Size1/2 inch
The concrete mix design numberUnknown Lot numberUnknown
Sublot numberUnknown HMA Design ID
Test Details
DIME Sample ID: 2019-07-09-10
DIME Test ID: 2019-07-09-10-8
Testing Lab: CT - Southern Regional Laboratory
Test Method: CTM 301-March 2000: Method of Test for Determining the Resistance "R"; Value of Treated and Untreated Bases, Subbases, and Basement Soils by the Stabilometer
Test Release Date: 2019-08-22
Test Results

How will the R value be determined?: By stabilometer
Input Type: Calculated
Tester's full name: Tess Perez
Date of test: 07/24/2019
As Received Gradation, Percent Passing 3 in. sieve: 100 %
As Received Gradation, Percent Passing 2 1/2 in. sieve: 100 %
As Received Gradation, Percent Passing 2 in. sieve: 100 %
As Received Gradation, Percent Passing 1 1/2 in. sieve: 100 %
As Received Gradation, Percent Passing 1 in. sieve: 100 %
As Received Gradation, Percent Passing 3/4 in. sieve: 100 %
As Received Gradation, Percent Passing 1/2 in. sieve: 98 %
As Received Gradation, Percent Passing 3/8 in. sieve: 93 %
As Received Gradation, Percent Passing #4 sieve: 74 %
As Received Gradation, Percent Passing #8 sieve: 52 %
As Received Gradation, Percent Passing #16 sieve: 36 %
As Received Gradation, Percent Passing #30 sieve: 24 %
As Received Gradation, Percent Passing #50 sieve: 16 %
As Received Gradation, Percent Passing #100 sieve: 10 %
As Received Gradation, Percent Passing #200 sieve: 6.7 %
As Used Gradation, Percent Passing 3 in. sieve: 100 %
As Used Gradation, Percent Passing 2 1/2 in. sieve: 100 %
As Used Gradation, Percent Passing 2 in. sieve: 100 %
As Used Gradation, Percent Passing 1 1/2 in. sieve: 100 %
As Used Gradation, Percent Passing 1 in. sieve: 100 %
As Used Gradation, Percent Passing 3/4 in. sieve: 100 %
As Used Gradation, Percent Passing 1/2 in. sieve: 98 %
As Used Gradation, Percent Passing 3/8 in. sieve: 93 %
As Used Gradation, Percent Passing #4 sieve: 74 %
As Used Gradation, Percent Passing #8 sieve: 52 %
As Used Gradation, Percent Passing #16 sieve: 36 %
As Used Gradation, Percent Passing #30 sieve: 24 %
As Used Gradation, Percent Passing #50 sieve: 16 %
As Used Gradation, Percent Passing #100 sieve: 10 %
As Used Gradation, Percent Passing #200 sieve: 6.7 %
R value:72
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 08/22/2019