Test 2019-05-01-28-1 (AASHTO T27-14) Summary

Project Information
Project IdentifiersProject ID: 66667
DEA: JMFPP
EFIS: 0019000043
DIST-CO-RTE-PM59---
Work DescriptionSpecial project for submitting Sample information for JMF Prequalification Program.
Location DescriptionNot set
Sample Information
Sample Taken Date5/1/2019 Sample Unique Key28
Will the laboratory/organization for which you are a member perform testing on this material sample?No Date that the sample was received by the laboratory/organization performing the testingNot set
Sample typeQuality Control A brief description of the sample1/2 " HMA-SP w/15% RAP
The quantity of what the sample constitutes1 From where was the sample collectedSource
First name of sampler or witnessed byMichael Last name of sampler or witnessed byDavis
Title of samplerQC Technician Laboratory sample identification
The fabricator/manufacturer/facility nameSierra Pacific - Avenal Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name
Material Information
Material TypeAggregate Source Identification (SMARA or name of Pit)91-10-0006::AVENAL AGGREGATES
The fabricator's/manufacturer's product name for the sample The fabricator/manufacturer designation for the sample
The plant number A detailed description of where the material sample was collectedStockpile @ Plant
Where the material sample would have been placed if not sampled Primary Aggregate Nominal Sizefine
The concrete mix design number Lot number
Sublot number HMA Design ID JMF3512-2019-124-TEM12SPLA
Test Details
DIME Sample ID: 2019-05-01-28
DIME Test ID: 2019-05-01-28-1
Testing Lab: CT HQ - Hot Mix Asphalt Laboratory
Test Method: AASHTO T27-14: Standard Method of Test for Sieve Analysis of Fine and Coarse Aggregates (Sieve Analysis)
Test Release Date: 2019-08-06
Test Results

What type of gradation is being tested?: HMA Gradation
Does this test use 1/4 sieve? (question for HMA Gradation Type): Yes
Input Type: Calculated
Tester's full name: Gurpartap Grewal
Date of test: 05/01/2019
Cumulative percent passing the 1 1/2 in. sieve:100 %
Cumulative percent passing the 1 in. sieve:100 %
Cumulative percent passing the 3/4 in. sieve:100 %
Cumulative percent passing the 1/2 in. sieve:100 %
Cumulative percent passing the 3/8 in. sieve:100 %
Cumulative percent passing the 1/4 in. sieve:100 %
Cumulative percent passing the #4 sieve:99 %
Cumulative percent passing the #8 sieve:80 %
Cumulative percent passing the #16 sieve:60 %
Cumulative percent passing the #30 sieve:47 %
Cumulative percent passing the #50 sieve:37 %
Cumulative percent passing the #100 sieve:29 %
Cumulative percent passing the #200 sieve:18 %
General comments (publicly viewable) (Max 250 characters): T-27 RD

Test was verified on 08/06/2019