Summary for Test 2019-05-29-32-2

Test performed: CTM 670-December 2013

Project Information

Project IdentifiersProject ID: 208973
DEA: 120H1004
EFIS: 1200000180
COOP: 120670
DIST-CO-RTE-PM12-ORA-405,73,405,605-9.3/24.3
Award Date11/07/2016
Closeout DateNot set
Work Description(Alternative Delivery) San Diego Freeway (I-405) Improvement Project SR-73 to I-605, Design Build Project, Administered by Orange County Transportation Authority, Caltrans METS to perform Source Inspection per RFP.
Location DescriptionOrange and Los Angeles Counties: 12-ORA-405 PM 9.3/24.2 / 07-LA-405 PM 0.0/1.2 12-ORA-22 PM R0.7/R3.8 / 12-ORA-22 PM R0.5/R0.7 12-ORA-73 PM R27.2/R27.8 / 12-ORA-605 PM 3.5/R1.6 07-LA-605 PM R0.0/R1.2
QA Service Level1 (Verified on 09/10/2015)

Sample Information

Sample Taken Date05/29/2019 Sample Unique Key32
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing07/11/2019
Sample typeQuality Assurance A brief description of the sampleHRC 500 510 Couplers
The quantity of what the sample constitutes4 From where was the sample collectedJob Site
First name of sampler or witnessed byAlex Last name of sampler or witnessed byAngha
Title of sampler Telephone number of sampler
Laboratory sample identification Linked DIME Sample ID
The fabricator/manufacturer/facility nameHRC CMC Rebar Transportation Laboratory (TL) NumberC665505
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name

Material Information

Material TypeSMTL TM5 - Couplers Production or Authorization TestingProduction Testing
Service or UltimateUltimate Material Standard CodeASTM A706
Material Grade60 Rebar ManufacturerCMC Rebar
Coupler ManufacturerHRC Intermediate Assembler or FabricatorUnknown
Rebar Size10 Coupler ModelHRC 500 510
Coating StandardsUncoated Shape of RebarStraight
Rebar Hoop DiameterUnknown Rebar Hoop FabricatorUnknown
Coupler Component Heat/Lot Number(s)7311304 74113607 Rebar Heat Number(s)9000538
Rebar Size 2 Coupler Unique IDNot set

Test Details

DIME Sample ID: 2019-05-29-32
DIME Test ID: 2019-05-29-32-2
Testing Lab: CT HQ - Sacramento Structural Materials Testing Laboratory
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile Slip)
Test Release Date: 2019-07-12

Test Results


Number of Samples: 1
Input Type: Measured
Tester's full name: Brian
Date of test: 07/12/2019
UTM: 400KIP
Halo ID: Small
Temperature: 72 F
NumSampleMfg. Lot Number(s)SizeArea (sqin)Slip (inch)Peak Load (lbf)Peak Stress (psi)CommentsTested By
121#10/32mm1.270128690101330Service SpliceBrian

General comments (publicly viewable) (Max 1000 characters): Service Splice
Test Graph
Source: Partner Data Point File
Test graph for the Sample

Test was verified on 7/12/2019