Summary for Test 2014-07-09-10309354-2

Test performed: ASTM C231-10

Project Information

Project IdentifiersProject ID: 209175
DEA: 030F2204
EFIS: 0300000072
DIST-CO-RTE-PM03-ED-50-R30.7/R31.7
Award Date02/25/2014
Closeout Date07/30/2015
Work DescriptionREPLACE BRIDGE.
Location DescriptionSLY PARK UNDERCROSSING
QA Service Level1 (Verified on 11/01/2013)

Sample Information

Sample Taken Date07/09/2014 Sample Unique Key10309354
Will the laboratory/organization for which you are a member perform testing on this material sample?No Date that the sample was received by the laboratory/organization performing the testingNot set
Sample typeVerification A brief description of the sampleConcrete in wheelbarrow
The quantity of what the sample constitutesConcrete in wheelbarrow From where was the sample collectedOther
First name of sampler or witnessed byBrian Last name of sampler or witnessed byFranklin
Title of samplerASR Telephone number of sampler(916) 880-8535
Laboratory sample identificationNot set Linked DIME Sample IDNot set
The fabricator/manufacturer/facility nameJobsite Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier25-0042
Structure nameSly Park Rd UC

Material Information

Material TypeConcrete The concrete mix design numberSF718AFST0
The truck number from where the sample was collected47 The batch plant ticket number from where the sample was collected1045890
Concrete batch plant1B The fabricator/manufacturer designation for the sampleNot set
A detailed description of where the material sample was collectedDischarge from concrete truck into wheelbarrow Where the material sample would have been placed if not sampledStage 1 Abutment 2 Retaining Wall
From Lot No.Not set Bag Lot No.Not set

Test Details

DIME Sample ID: 2014-07-09-10309354
DIME Test ID: 2014-07-09-10309354-2
Testing Lab: CT D03 - Sacramento Sanders Structures Construction Field Office
Test Method: ASTM C231-10: Standard Test Method for Air Content of Freshly Mixed Concrete by the Pressure Method
Test Release Date: 2014-07-23

Test Results


Is wet sieving required?: No
Input Type: Measured
Tester's full name: Brian Franklin
Date of test: 07/09/2014
Apparent air content: 5.5 %
Aggregate correction factor: no data %
Air content: 5.5 %
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 7/23/2014