Test 2014-04-16-9302503-3 (CTM 211-May 2010) Summary

Project Information
Project IdentifiersProject ID: 7427
DEA: 07215934
EFIS: 0700001833
DIST-CO-RTE-PM07-LA-5-2.4/4.0
Work DescriptionWiden and Realign Freeway and Construct Ped OC, OC and UC Structures.
Location DescriptionLOS ANGELES COUNTY IN SANTA FE SPRINGS AND NORWALK FROM 0.1 MILE NORTH OF CARMENITA ROAD OVERCROSSING TO 0.1 MILE NORTH OF SILVERBOW AVENUE PEDESTRIAN OVERCROSSING
Sample Information
Sample Taken Date4/16/2014 Sample Unique Key9302503
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing4/18/2014
Sample typeAnnual Source Testing A brief description of the sample3/8 Rock
The quantity of what the sample constitutes6 Bags From where was the sample collectedSource
First name of sampler or witnessed byUnknown Last name of sampler or witnessed byUnknown
Title of samplerNot set Laboratory sample identification4127B
The fabricator/manufacturer/facility nameVulcan Materials Company - San Bernardino Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifierNot set
Structure nameNot set
Material Information
Material TypeAggregate Source Identification (SMARA or name of Pit)SMARA No. 91-36-0012
The fabricator's/manufacturer's product name for the sampleNot set The fabricator/manufacturer designation for the sampleNot set
The plant numberNot set A detailed description of where the material sample was collectedStockpile
Where the material sample would have been placed if not sampledNot set Primary Aggregate Nominal Size3/8 inch
The concrete mix design number Lot numberNot set
Sublot numberNot set HMA Design ID
Test Details
DIME Sample ID: 2014-04-16-9302503
DIME Test ID: 2014-04-16-9302503-3
Testing Lab: CT - Southern Regional Laboratory
Test Method: CTM 211-May 2010: Abrasion of Coarse Aggregate by Use of the Los Angeles Abrasion Testing Machine
Test Release Date: 2015-02-20
Test Results

How many revolutions are required?: 500 Revolution Test
Input Type: Calculated
Tester's full name: Nader Rashidi
Date of test: 05/06/2014
Grading: C
Percent wear:34 %
General comments (publicly viewable) (Max 250 characters):

Test was verified on 02/20/2015