Summary for Test 2019-05-10-26-5

Test performed: CTM 202-November 2011

Project Information

Project IdentifiersProject ID: 213551
DEA: 080K2934
EFIS: 0812000100
DIST-CO-RTE-PM08-SBD-10-R36.8/R39.2
Award Date11/09/2018
Closeout Date09/15/2021
Work DescriptionPAVEMENT REHABILITATION AND CONTINUOUSLY REINFORCED CONCRETE PAVEMENT
Location DescriptionSAN BERNARDINO COUNTY IN YUCAIPA FROM 0.2 MILE WEST OF LIVE OAK CANYON ROAD TO COUNTY LINE ROAD UNDERCROSSING
QA Service Level1 (Verified on 12/31/2018)

Sample Information

Sample Taken Date05/10/2019 Sample Unique Key26
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing05/10/2019
Sample typePer Request A brief description of the sampleAggregate Subbase
The quantity of what the sample constitutes1 bag From where was the sample collectedJob Site
First name of sampler or witnessed byEzz Last name of sampler or witnessed byGayed
Title of samplerResident Engineer Telephone number of sampler(909) 825-2753
Laboratory sample identification Linked DIME Sample ID
The fabricator/manufacturer/facility nameCaltrans Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name

Material Information

Material TypeAggregate Source Identification (SMARA, name of Pit or Job Site)Unknown
The fabricator's/manufacturer's product name for the sampleUnknown The fabricator/manufacturer designation for the sampleUnknown
The plant numberUnknown A detailed description of where the material sample was collectedExisting Subbase
Where the material sample would have been placed if not sampledUnknown Primary Aggregate Nominal Size1-1/2 inch
The concrete mix design numberUnknown Lot numberUnknown
Sublot numberUnknown Aggregate Mix NumberNot set

Test Details

DIME Sample ID: 2019-05-10-26
DIME Test ID: 2019-05-10-26-5
Testing Lab: CT D08 - Fontana Southern Regional Laboratory
Test Method: CTM 202-November 2011: Method of Test for Sieve Analysis of Fine and Coarse Aggregates
Test Release Date: 2019-06-11

Test Results


What size aggregate is being tested?: Combined Gradation
Individual or cumulative mass retained on each sieve?: Cumulative Mass Retained
For Combined Gradation only, has the fine aggregate sample been reduced?: No
For Combined Gradation only, use #40 Sieve?: No
Input Type: Calculated
Tester's full name: Husni Ankir
Date of test: 05/11/2019
Cumulative percent passing the 3 in. sieve: 100 %
Cumulative percent passing the 2 1/2 in. sieve: 100 %
Cumulative percent passing the 2 in. sieve: 99 %
Cumulative percent passing the 1 1/2 in. sieve: 99 %
Cumulative percent passing the 1 in. sieve: 99 %
Cumulative percent passing the 3/4 in. sieve: 98 %
Cumulative percent passing the 1/2 in. sieve: 96 %
Cumulative percent passing the 3/8 in. sieve: 95 %
Cumulative percent passing the #4 sieve: 93 %
Cumulative percent passing the #8 sieve: 89 %
Cumulative percent passing the #16 sieve: 84 %
Cumulative percent passing the #30 sieve: 75 %
Cumulative percent passing the #50 sieve: 64 %
Cumulative percent passing the #100 sieve: 50 %
Cumulative percent passing the #200 sieve: 37 %
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 6/4/2019