Summary for Test 2019-05-06-4-1

Test performed: CTM 670-December 2013

Project Information

Project IdentifiersProject ID: 211848
DEA: 112T2174
EFIS: 1116000131
DIST-CO-RTE-PM11-SD-5-R37.4 - R46.5
Award Date12/22/2016
Closeout DateNot set
Work Description(Alternative Delivery) CMGC, San Elijo Highway Bridge Replacement. Replace the San Elijo lagoon highway bridge, construct HOV lanes, construct bike and pedestrian trails and bridge, build multi-use facility at Manchester Ave.
Location DescriptionIN SAN DIEGO COUNTY IN SOLANA BEACH AND ENCINITAS FROM 0.1 MILE NORTH OF LOMAS SANTA FE DRIVE OVERCROSSING TO 0.2 MILE SOUTH OF BIRMINGHAM DRIVE OVERCROSSING
QA Service Level1 (Verified on 01/31/2017)

Sample Information

Sample Taken Date05/06/2019 Sample Unique Key4
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing05/15/2019
Sample typeQuality Assurance A brief description of the sample#5 Lenton Coupler
The quantity of what the sample constitutes63 From where was the sample collectedSource
First name of sampler or witnessed byPrakash Last name of sampler or witnessed byPatel
Title of samplerTET Telephone number of sampler5626654686
Laboratory sample identification Linked DIME Sample ID
The fabricator/manufacturer/facility nameCMC Gerdau Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure nameType 80 Barrier

Material Information

Material TypeSMTL TM5 - Couplers Production or Authorization TestingAuthorization Testing
Service or UltimateService Material Standard CodeASTM A706
Material Grade60 Rebar ManufacturerGerdau CMC
Coupler ManufacturerCMC Gerdau Intermediate Assembler or Fabricator
Rebar Size5 Coupler ModelLenton A2
Coating StandardsUncoated Shape of RebarStraight
Rebar Hoop Diameter Rebar Hoop Fabricator
Coupler Component Heat/Lot Number(s)L9187 Rebar Heat Number(s)6503222002
Rebar Size 2 Coupler Unique IDNot set

Test Details

DIME Sample ID: 2019-05-06-4
DIME Test ID: 2019-05-06-4-1
Testing Lab: CT HQ - Sacramento Structural Materials Testing Laboratory
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile Slip)
Test Release Date: 2019-05-23

Test Results


Number of Samples: 1
Input Type: Measured
Tester's full name: Brian
Date of test: 05/16/2019
UTM: 400KIP
Halo ID: Small
Temperature: 72 F
NumSampleMfg. Lot Number(s)SizeArea (sqin)Slip (inch)Peak Load (lbf)Peak Stress (psi)CommentsTested By
111#5/16mm0.310.00162925994384Service SpliceBrian

General comments (publicly viewable) (Max 1000 characters): Service Splice
Test Graph
Source: Partner Data Point File
Test graph for the Sample

Test was verified on 5/16/2019