Summary for Test 2019-05-08-1-2
Test performed: CTM 670-December 2013Project Information
Project Identifiers | Project ID: 212245 DEA: 024F8604 EFIS: 0213000043 |
---|---|
DIST-CO-RTE-PM | 02-TRI-36-26.7/27.1 |
Award Date | 11/02/2018 |
Closeout Date | 05/23/2022 |
Work Description | ROADWAY REALIGNMENT AND NEW BRIDGE CONSTRUCTION |
Location Description | TRINITY COUNTY ABOUT 9 MILES EAST OF FOREST GLEN FROM 0.6 MILE WEST TO 0.1 MILE WEST OF ROUTE 3 |
QA Service Level | 1 (Verified on 03/21/2017) |
Sample Information
Sample Taken Date | 05/08/2019 | Sample Unique Key | 1 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 05/09/2019 |
Sample type | Quality Assurance | A brief description of the sample | 8 Rebar Couplers |
The quantity of what the sample constitutes | 8 | From where was the sample collected | Fabricator |
First name of sampler or witnessed by | Ryan | Last name of sampler or witnessed by | Parr |
Title of sampler | Associate Steel Inspector | Telephone number of sampler | (510) 385-5910 |
Laboratory sample identification | Linked DIME Sample ID | ||
The fabricator/manufacturer/facility name | Harris Rebar | Transportation Laboratory (TL) Number | 741533 |
Inspector Lot Number from the Transportation Laboratory (TL) Form | B373-018-19 | Structure unique identifier | |
Structure name |
Material Information
Material Type | SMTL TM5 - Couplers | Production or Authorization Testing | Production Testing |
---|---|---|---|
Service or Ultimate | Service | Material Standard Code | ASTM A615 |
Material Grade | 60 | Rebar Manufacturer | Nucor |
Coupler Manufacturer | BarTec | Intermediate Assembler or Fabricator | |
Rebar Size | 8 | Coupler Model | Bartec |
Coating Standards | Uncoated | Shape of Rebar | Straight |
Rebar Hoop Diameter | Rebar Hoop Fabricator | ||
Coupler Component Heat/Lot Number(s) | DL17101289 | Rebar Heat Number(s) | 3500005185 |
Rebar Size 2 | Coupler Unique ID | Not set |
Test Details
DIME Sample ID: 2019-05-08-1
DIME Test ID: 2019-05-08-1-2
Testing Lab: CT HQ - Sacramento Structural Materials Testing Laboratory
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile Slip)
Test Release Date: 2019-05-17
Test Results
Number of Samples: 1
Input Type: Measured
Tester's full name: Brian
Date of test: 05/10/2019
UTM: 400KIP
Halo ID: Small
Temperature: 72 F
Num | Sample | Mfg. Lot Number(s) | Size | Area (sqin) | Slip (inch) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By |
---|---|---|---|---|---|---|---|---|---|
1 | 2 | C01 | #8/25mm | 0.79 | 0 | 78510 | 99380 | Service Splice | Brian |
General comments (publicly viewable) (Max 1000 characters): Service Splice
Test Graph
Source: Partner Data Point FileTest graph for the Sample
Test was verified on 5/10/2019 ✔