Test 2019-04-17-16-7 (CTM 202-November 2011) Summary

Project Information
Project IdentifiersProject ID: 210837
DEA: 080J0804
EFIS: 0800000283
COOP: 081625
DIST-CO-RTE-PM08-RIV-15-34.7/51.6
Work Description(Alternative Delivery) DESIGN-BUILD OF THE INTERSTATE 15 EXPRESS LANES PROJECT
Location DescriptionRiverside County and SBD-15-0.0/1.3
Sample Information
Sample Taken Date4/17/2019 Sample Unique Key16
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing4/17/2019
Sample typePer Request A brief description of the sampleAggregate Subbase
The quantity of what the sample constitutes1 bag From where was the sample collectedJob Site
First name of sampler or witnessed byAri Last name of sampler or witnessed byKHASRAW
Title of sampler Laboratory sample identification
The fabricator/manufacturer/facility nameCaltrans Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifierNot set
Structure nameNot set
Material Information
Material TypeAggregate Source Identification (SMARA or name of Pit)Unknown
The fabricator's/manufacturer's product name for the sampleUnknown The fabricator/manufacturer designation for the sampleUnknown
The plant numberUnknown A detailed description of where the material sample was collectedI-15 NB
Where the material sample would have been placed if not sampledUnknown Primary Aggregate Nominal Size3/4 inch
The concrete mix design numberUnknown Lot numberUnknown
Sublot numberUnknown HMA Design ID
Test Details
DIME Sample ID: 2019-04-17-16
DIME Test ID: 2019-04-17-16-7
Testing Lab: CT - Southern Regional Laboratory
Test Method: CTM 202-November 2011: Method of Test for Sieve Analysis of Fine and Coarse Aggregates
Test Release Date: 2019-05-07
Test Results

What size aggregate is being tested?: Fine Aggregate
Individual or cumulative mass retained on each sieve?: Cumulative Mass Retained
Input Type: Calculated
Tester's full name: Husni Ankir
Date of test: 04/20/2019
Cumulative percent passing the 3/8 in. sieve:100 %
Cumulative percent passing the #4 sieve:100 %
Cumulative percent passing the #8 sieve:45 %
Cumulative percent passing the #16 sieve:35 %
Cumulative percent passing the #30 sieve:25 %
Cumulative percent passing the #50 sieve:17 %
Cumulative percent passing the #100 sieve:11 %
Cumulative percent passing the #200 sieve:8 %
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 04/30/2019