Summary for Test 2019-03-07-16-1

Test performed: AASHTO T27-14

Project Information

Project IdentifiersProject ID: 212816
DEA: 020H6304
EFIS: 0215000063
DIST-CO-RTE-PM02-LAS-139-6.2/7.3
Award Date06/29/2018
Closeout Date12/04/2019
Work DescriptionROADWAY EXCAVATION, AGGREGATE BASE, HOT MIX ASPHALT, GUARDRAIL
Location DescriptionLASSEN COUNTY ABOUT 6 MILES NORTH OF SUSANVILLE FROM 1.0 MILE SOUTH TO 0.1 MILE SOUTH OF ANTELOPE RADIO STREET
QA Service Level1 (Verified on 01/17/2018)

Sample Information

Sample Taken Date03/07/2019 Sample Unique Key16
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing03/07/2019
Sample typeQuality Control A brief description of the sampleLime
The quantity of what the sample constitutesMix Design From where was the sample collectedSource
First name of sampler or witnessed byKRC Last name of sampler or witnessed byKRC
Title of sampler Telephone number of sampler
Laboratory sample identification Linked DIME Sample ID
The fabricator/manufacturer/facility nameLhoist North America Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifierNot set
Structure nameNot set

Material Information

Material TypeAntistrip Additive Antistrip TypeLime - hydrated lime
Antistrip Additive Mix NumberNot set

Test Details

DIME Sample ID: 2019-03-07-16
DIME Test ID: 2019-03-07-16-1
Testing Lab: CT D02 - Redding Northern Regional Laboratory
Test Method: AASHTO T27-14: Standard Method of Test for Sieve Analysis of Fine and Coarse Aggregates (Sieve Analysis)
Test Release Date: 2019-04-09

Test Results


What type of gradation is being tested?: HMA Gradation
Individual or cumulative mass retained on each sieve?: Cumulative Mass Retained
Does this test use 1/4 sieve? (question for HMA Gradation Type): Yes
Has the fine aggregate sample been reduced?: No
Input Type: Calculated
Tester's full name: Assumed
Date of test: 03/07/2019
Cumulative percent passing the 1 1/2 in. sieve: 100 %
Cumulative percent passing the 1 in. sieve: 100 %
Cumulative percent passing the 3/4 in. sieve: 100 %
Cumulative percent passing the 1/2 in. sieve: 100 %
Cumulative percent passing the 3/8 in. sieve: 100 %
Cumulative percent passing the 1/4 in. sieve: 100 %
Cumulative percent passing the #4 sieve: 100 %
Cumulative percent passing the #8 sieve: 100 %
Cumulative percent passing the #16 sieve: 100 %
Cumulative percent passing the #30 sieve: 97 %
Cumulative percent passing the #50 sieve: 92 %
Cumulative percent passing the #100 sieve: 86 %
Cumulative percent passing the #200 sieve: 80 %
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 4/9/2019