Summary for Test 2019-03-27-16-2

Test performed: CTM 670-December 2013

Project Information

Project IdentifiersProject ID: 211260
DEA: 072159U4
EFIS: 0715000160
DIST-CO-RTE-PM07-LA,ORA-5-0.0/1.5, 44.3/44.4
Award Date05/27/2016
Closeout Date08/01/2023
Work DescriptionCONSTRUCT HOV LANES AND MIX FLOW LANES.
Location DescriptionLOS ANGELES AND ORANGE COUNTIES IN BUENA PARK, LA MIRADA, CERRITOS AND SANTA FE SPRINGS FROM ARTESIA BOULEVARD UNDERCROSSING TO NORTH FORK COYOTE CREEK
QA Service Level1 (Verified on 03/16/2016)

Sample Information

Sample Taken Date03/27/2019 Sample Unique Key16
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing04/03/2019
Sample typeQuality Assurance A brief description of the sampleDouble Barrel Zap Screwlok
The quantity of what the sample constitutes4 From where was the sample collectedJob Site
First name of sampler or witnessed byP Last name of sampler or witnessed byPicazo
Title of sampler Telephone number of sampler
Laboratory sample identification Linked DIME Sample ID
The fabricator/manufacturer/facility nameBarSplice Gerdau Transportation Laboratory (TL) NumberC670107
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifierNot set
Structure nameNot set

Material Information

Material TypeSMTL TM5 - Couplers Production or Authorization TestingProduction Testing
Service or UltimateService Material Standard CodeASTM A706
Material Grade60 Rebar ManufacturerGerdau
Coupler Manufacturerbarsplice Intermediate Assembler or FabricatorUnknown
Rebar Size6 Coupler ModelDouble Barrel Zap Screwlok
Coating StandardsUncoated Shape of RebarStraight
Rebar Hoop DiameterUnknown Rebar Hoop FabricatorUnknown
Coupler Component Heat/Lot Number(s)9036 Rebar Heat Number(s)65033080
Rebar Size 2 Coupler Unique IDNot set

Test Details

DIME Sample ID: 2019-03-27-16
DIME Test ID: 2019-03-27-16-2
Testing Lab: CT HQ - Sacramento Structural Materials Testing Laboratory
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile)
Test Release Date: 2019-04-11

Test Results


Number of Samples: 1
Input Type: Measured
Tester's full name: Fred
Date of test: 04/04/2019
UTM: 400KIP
Temperature: 72 F
NumSampleMfg. Lot Number(s)SizeArea (sqin)Peak Load (lbf)Peak Stress (psi)CommentsTested By
12186#6/19mm0.444215095800Service SpliceFred

General comments (publicly viewable) (Max 1000 characters): Service Splice
Test Graph
Source: Partner Data Point File
Test graph for the Sample

Test was verified on 4/4/2019