Summary for Test 2019-03-27-13-2

Test performed: CTM 385-November 2016

Project Information

Project IdentifiersProject ID: 66667
DEA: JMFPP
EFIS: 0019000043
DIST-CO-RTE-PM59---
Award DateNot set
Closeout DateNot set
Work DescriptionSpecial project for submitting Sample information for JMF Prequalification Program.
Location DescriptionNot set
QA Service LevelNOT VERIFIED

Sample Information

Sample Taken Date03/27/2019 Sample Unique Key13
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing03/27/2019
Sample typeQuality Control A brief description of the sampleScrap - Crumb Rubber Modifier - BAS Recycling Inc.
The quantity of what the sample constitutes1 sample set From where was the sample collectedManufacturer
First name of sampler or witnessed byDavid Last name of sampler or witnessed byRuedi
Title of sampler Telephone number of sampler
Laboratory sample identification Linked DIME Sample ID
The fabricator/manufacturer/facility nameBAS Recycling Inc Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifierNot set
Structure nameNot set

Material Information

Material TypeCrumb Rubber Modifier CRM TypeScrap Tire
Crumb Rubber Modifier Mix NumberNot set

Test Details

DIME Sample ID: 2019-03-27-13
DIME Test ID: 2019-03-27-13-2
Testing Lab: CT HQ - Sacramento Hot Mix Asphalt Laboratory
Test Method: CTM 385-November 2016: Method of Test for Sampling and Testing Crumb Rubber Modifier (CRM)
Test Release Date: 2019-04-10

Test Results


CRM Gradation Type: Scrap Tire
Input Type: Calculated
Tester's full name: Mike Paulson
Date of test: 04/01/2019
Scrap Tire CRM gradation (% passing No. 8 sieve): 100 %
Wire in CRM: no data
Fabric in CRM: no data
General comments (publicly viewable) (Max 1000 characters): JMFPP: CT 385 Scrap - Crumb Rubber Modifier - BAS Recycling Inc.

Test was verified on 4/3/2019