Summary for Test 2018-07-12-5-11

Test performed: ASTM C266-15

Project Information

Project IdentifiersProject ID: 88888
DEA: SMTL-STOCK
EFIS: SMTL-STOCK
DIST-CO-RTE-PM59---
Award DateNot set
Closeout DateNot set
Work DescriptionSpecial project for SMTL stock material. Object Code: 1025. J2 DEA: 912680.
Location DescriptionNot set
QA Service LevelNOT VERIFIED

Sample Information

Sample Taken Date07/12/2018 Sample Unique Key5
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing07/12/2018
Sample typeProficiency A brief description of the sampleCCRL 210
The quantity of what the sample constitutes1 Bucket From where was the sample collectedSource
First name of sampler or witnessed byUnknown Last name of sampler or witnessed byUnknown
Title of samplerUnknown Telephone number of samplerUnknown
Laboratory sample identificationCM188210 Linked DIME Sample IDUnknown
The fabricator/manufacturer/facility nameCCRL Transportation Laboratory (TL) NumberUnknown
Inspector Lot Number from the Transportation Laboratory (TL) FormUnknown Structure unique identifierNot set
Structure nameNot set

Material Information

Material TypeCementitious BrandCCRL
MillCCRL Type of Cementitious MaterialType II Cement

Test Details

DIME Sample ID: 2018-07-12-5
DIME Test ID: 2018-07-12-5-11
Testing Lab: CT HQ - Sacramento Cement Testing Laboratory
Test Method: ASTM C266-15: Standard Test Method for Time of Setting of Hydraulic-Cement Paste by Gillmore Needles
Test Release Date: 2019-02-20

Test Results


Input Type: Calculated
Tester's full name: Benjamin Lenz
Date of test: 07/30/2018
Initial time of setting: 165 min
Final time of setting: 245 min
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 2/13/2019