Summary for Test 2018-05-04-17-1

Test performed: CTM 204-June 2010

Project Information

Project IdentifiersProject ID: 212741
DEA: 020E1804
EFIS: 0200000022
DIST-CO-RTE-PM02-PLU-89-29.8/30.2
Award Date12/13/2017
Closeout Date12/17/2021
Work DescriptionBRIDGE REPLACEMENT
Location DescriptionPLUMAS COUNTY NEAR CANYON DAM FROM 0.2 MILE SOUTH TO 0.3 MILE NORTH OF LAKE ALMANOR SPILLWAY
QA Service Level1 (Verified on 12/06/2017)

Sample Information

Sample Taken Date05/04/2018 Sample Unique Key17
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing05/07/2018
Sample typeVerification A brief description of the sampleSized, Untreated, Virgin Aggregates
The quantity of what the sample constitutesJMF Verification From where was the sample collectedSource
First name of sampler or witnessed byDerrick Last name of sampler or witnessed byCurry
Title of sampler Telephone number of sampler
Laboratory sample identificationD77352 Linked DIME Sample ID
The fabricator/manufacturer/facility nameSierra Cascade Aggregate and Asphalt Products Transportation Laboratory (TL) Number894770
Inspector Lot Number from the Transportation Laboratory (TL) FormJMF 18-04-S1 Structure unique identifierNot set
Structure nameNot set

Material Information

Material TypeAggregate Source Identification (SMARA, name of Pit or Job Site)91-32-0002::CHESTER PIT
The fabricator's/manufacturer's product name for the sampleUnknown The fabricator/manufacturer designation for the sample18-1932.49
The plant numberUnknown A detailed description of where the material sample was collectedStockpiles
Where the material sample would have been placed if not sampledUnknown Primary Aggregate Nominal Size3/4 inch
The concrete mix design numberJMF 18-04-S1 Lot numberNot set
Sublot numberNot set Aggregate Mix NumberNot set

Test Details

DIME Sample ID: 2018-05-04-17
DIME Test ID: 2018-05-04-17-1
Testing Lab: CT D02 - Redding Northern Regional Laboratory
Test Method: CTM 204-June 2010: Method of Test for Liquid Limit, Plastic Limit and Plasticity Index of Soils (Plasticity Index)
Test Release Date: 2019-01-18

Test Results


The test method used?: Plastic Index
Input Type: Calculated
Tester's full name: Mike Cruz
Date of test: 05/18/2018
Liquid Limit (LL): 0 %
Plastic Limit (PL): 0 %
Plastic Index(PI): NP
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 1/18/2019