Test 2018-10-01-12-4 (CTM 553-1) Summary

Project Information
Project IdentifiersProject ID: 212577
DEA: 11408704
EFIS: 1112000017
DIST-CO-RTE-PM11-SD-8-9.0/15.3
Work DescriptionSLAB REPLACEMENT, COLD PLANE, GRIND PAVEMENT AND REPLACE GUARDRAIL.
Location DescriptionSAN DIEGO COUNTY FROM 0.6 MILE WEST OF LAKE MURRAY BOULEVARD OVERCROSSING IN SAN DIEGO TO JOHNSON AVENUE UNDERCROSSING IN EL CAJON
Sample Information
Sample Taken Date10/1/2018 Sample Unique Key12
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing10/1/2018
Sample typeAcceptance A brief description of the sampleRapid Setting Cement
The quantity of what the sample constitutes1 Bucket From where was the sample collectedJob Site
First name of sampler or witnessed byna Last name of sampler or witnessed byna
Title of samplerUnknown Laboratory sample identificationCM184801
The fabricator/manufacturer/facility nameCMAX Transportation Laboratory (TL) Numberna
Inspector Lot Number from the Transportation Laboratory (TL) FormUnknown Structure unique identifierNot set
Structure nameNot set
Material Information
Material TypeCementitious BrandCMAX
MillUnknown Type of Cementitious MaterialRapid Set Cement
Test Details
DIME Sample ID: 2018-10-01-12
DIME Test ID: 2018-10-01-12-4
Testing Lab: CT HQ - Sacramento Cement Testing Laboratory
Test Method: CTM 553-1: Method for Testing Thermal Stability of Mortar Made with Hydraulic Cement
Test Release Date: 2019-01-21
Test Results

Input Type: Calculated
Tester's full name: Benjamin Lenz
Date of test: 10/19/2018
Average of test specimens broken to nearest 50 kPa, 23 ± 1.7°C for 48h: 17850 kPa
Average of test specimens broken to nearest 50 kPa, 50 ± 1°C for 48h: 25250 kPa
Thermal stability ratio: 141
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 01/14/2019