Summary for Test 2014-06-13-6301695-1

Test performed: ASTM C1064-08

Project Information

Project IdentifiersProject ID: 209175
DEA: 030F2204
EFIS: 0300000072
DIST-CO-RTE-PM03-ED-50-R30.7/R31.7
Award Date02/25/2014
Closeout Date07/30/2015
Work DescriptionREPLACE BRIDGE.
Location DescriptionSLY PARK UNDERCROSSING
QA Service Level1 (Verified on 11/01/2013)

Sample Information

Sample Taken Date06/13/2014 Sample Unique Key6301695
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing06/15/2014
Sample typeVerification A brief description of the sample6x12 concrete cylinders
The quantity of what the sample constitutes4 concrete cylinders From where was the sample collectedOther
First name of sampler or witnessed byBrandon Last name of sampler or witnessed byMiller
Title of samplerSR Telephone number of sampler(916) 505-6839
Laboratory sample identificationNot set Linked DIME Sample IDNot set
The fabricator/manufacturer/facility nameJobsite Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier25 0042
Structure nameSly Park Rd UC

Material Information

Material TypeConcrete The concrete mix design numberSF718AFST0
The truck number from where the sample was collected27 The batch plant ticket number from where the sample was collected1044479
Concrete batch plant1B The fabricator/manufacturer designation for the sampleNot set
A detailed description of where the material sample was collectedDischarge from concrete truck into wheelbarrow Where the material sample would have been placed if not sampledStage 1 Abutment 2
From Lot No.Not set Bag Lot No.Not set

Test Details

DIME Sample ID: 2014-06-13-6301695
DIME Test ID: 2014-06-13-6301695-1
Testing Lab: CT D03 - Sacramento Sanders Structures Construction Field Office
Test Method: ASTM C1064-08: Standard Test Method for Temperature of Freshly Mixed Hydraulic-Cement Concrete
Test Release Date: 2014-06-16

Test Results


Input Type: Measured
Tester's full name: Brandon Miller
Date of test: 06/13/2014
Temperature: 68.4 F
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 6/16/2014