Summary for Test 2018-10-03-27-3

Test performed: AGGLP SIEVE_ANALYSIS-1

Project Information

Project IdentifiersProject ID: 66666
DEA: APP
EFIS: 0019000052
DIST-CO-RTE-PM59---
Award DateNot set
Closeout DateNot set
Work DescriptionSpecial project for submitting Sample information for Aggregate Pre-approval Program (APP). Object Code: 1025. J2 DEA: 912680.
Location DescriptionNot set
QA Service LevelNOT VERIFIED

Sample Information

Sample Taken Date10/03/2018 Sample Unique Key27
Will the laboratory/organization for which you are a member perform testing on this material sample?No Date that the sample was received by the laboratory/organization performing the testingNot set
Sample typeAggregate Prequalification Program A brief description of the sampleTesting for APP
The quantity of what the sample constitutesTesting for APP From where was the sample collectedSource
First name of sampler or witnessed byTesting for APP Last name of sampler or witnessed byTesting for APP
Title of sampler Telephone number of sampler
Laboratory sample identification Linked DIME Sample ID
The fabricator/manufacturer/facility nameTesting for APP Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifierNot set
Structure nameNot set

Material Information

Material TypeAggregate Source Identification (SMARA, name of Pit or Job Site)Testing for APP
The fabricator's/manufacturer's product name for the sample The fabricator/manufacturer designation for the sample
The plant number A detailed description of where the material sample was collectedTesting for APP
Where the material sample would have been placed if not sampled Primary Aggregate Nominal Size1-1/2 inch
The concrete mix design number Lot numberNot set
Sublot numberNot set Aggregate Mix NumberNot set
HMA PayNo

Test Details

DIME Sample ID: 2018-10-03-27
DIME Test ID: 2018-10-03-27-3
Testing Lab: CT HQ - APP Testing Lab
Test Method: AGGLP SIEVE_ANALYSIS-1: Soils for Corrosion Sieve Analysis
Test Release Date: 2019-02-04

Test Results


Input Type: Calculated
Tester's full name: PATRICK LO
Date of test: 10/04/2018
Cumulative percent passing the 2 in. sieve: 3 %
Cumulative percent passing the 1 1/2 in. sieve: 3 %
Cumulative percent passing the 1 in. sieve: 3 %
Cumulative percent passing the 3/4 in. sieve: 3 %
Cumulative percent passing the 1/2 in. sieve: 3 %
Cumulative percent passing the 3/8 in. sieve: 3 %
Cumulative percent passing the #4 sieve: 3 %
Cumulative percent passing the #8 sieve: 3.3 %
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 1/28/2019