Summary for Test 2014-05-27-12208644-1

Test performed: ASTM C138-10b

Project Information

Project IdentifiersProject ID: 209175
DEA: 030F2204
EFIS: 0300000072
DIST-CO-RTE-PM03-ED-50-R30.7/R31.7
Award Date02/25/2014
Closeout Date07/30/2015
Work DescriptionREPLACE BRIDGE.
Location DescriptionSLY PARK UNDERCROSSING
QA Service Level1 (Verified on 11/01/2013)

Sample Information

Sample Taken Date05/27/2014 Sample Unique Key12208644
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing05/27/2014
Sample typeQuality Control A brief description of the sampleAbutment 2 Stage 1 Footing Concrete Cylinders
The quantity of what the sample constitutes6 cylinders From where was the sample collectedSource
First name of sampler or witnessed byAndrei Last name of sampler or witnessed byPolischuk
Title of samplerField Technician Telephone number of samplerNot set
Laboratory sample identificationNot set Linked DIME Sample IDNot set
The fabricator/manufacturer/facility nameFolsom Ready Mix Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifierNot set
Structure nameNot set

Material Information

Material TypeConcrete The concrete mix design numberF628AFSTO
The truck number from where the sample was collectedNot set The batch plant ticket number from where the sample was collected77732174254
Concrete batch plantNot set The fabricator/manufacturer designation for the sampleNot set
A detailed description of where the material sample was collectedAbutment 2 Stage 1 Footing Concrete Where the material sample would have been placed if not sampledNot set
From Lot No.Not set Bag Lot No.Not set

Test Details

DIME Sample ID: 2014-05-27-12208644
DIME Test ID: 2014-05-27-12208644-1
Testing Lab: Viking Construction Company, Incorporated - Rancho Cordova
Test Method: ASTM C138-10b: Standard Test Method for Density (Unit Weight), Yield, and Air Content (Gravimetric) of Concrete
Test Release Date: 2014-07-02

Test Results


Input Type: Calculated
Tester's full name: Andrei Polischuk
Date of test: 05/27/2014
Identification of concrete represented by the sample: Abutment 2 Stage 1 Footing
Volume of the measure: 0.25 ft^3
Density of concrete: 150.8 lb/ft^3
Yield of concrete: no data
Relative yield of the batch: no data
Cement content: no data
Air content: no data
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 7/2/2014