Summary for Test 2018-07-06-10-1

Test performed: CTM 217-November 2014

Project Information

Project IdentifiersProject ID: 208945
DEA: 07288604
EFIS: 0700021080
COOP: 074663
DIST-CO-RTE-PM07-LA-710-6.0-9.4
Award Date09/02/2011
Closeout DateNot set
Work DescriptionGerald Desmond Bridge Replacement - A Design Build project. IQA samples will be selected by Port/Caltrans representatives and sent to Translab for testing.
Location DescriptionPort of Long Beach (District 7)
QA Service Level1 (Verified on 06/03/2013)

Sample Information

Sample Taken Date07/06/2018 Sample Unique Key10
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing07/23/2018
Sample typeQuality Assurance A brief description of the sampleW/C Sand
The quantity of what the sample constitutes1 bags From where was the sample collectedSource
First name of sampler or witnessed byJohn Last name of sampler or witnessed byDong
Title of samplerTEC Telephone number of samplerUnknown
Laboratory sample identificationUnknown Linked DIME Sample IDUnknown
The fabricator/manufacturer/facility nameassociated ready mix Transportation Laboratory (TL) NumberC913576
Inspector Lot Number from the Transportation Laboratory (TL) FormUnknown Structure unique identifierNot set
Structure nameNot set

Material Information

Material TypeAggregate Source Identification (SMARA, name of Pit or Job Site)signal hill
The fabricator's/manufacturer's product name for the sampleUnknown The fabricator/manufacturer designation for the sampleUnknown
The plant numberUnknown A detailed description of where the material sample was collectedassociated ready mix
Where the material sample would have been placed if not sampledUnknown Primary Aggregate Nominal Sizefine
The concrete mix design numberLWSBS5A Lot numberNot set
Sublot numberNot set Aggregate Mix NumberNot set
HMA PayNo

Test Details

DIME Sample ID: 2018-07-06-10
DIME Test ID: 2018-07-06-10-1
Testing Lab: CT HQ - Sacramento Aggregate Testing Laboratory
Test Method: CTM 217-November 2014: Method of Test for Sand Equivalent
Test Release Date: 2018-08-30

Test Results


How many times will the test be run?: Once
Input Type: Calculated
Tester's full name: Bang Nguyen
Date of test: 08/30/2018
Sand Equivalent: 85
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 8/30/2018