Summary for Test 2018-08-20-3-1

Test performed: CTM 670-December 2013

Project Information

Project IdentifiersProject ID: 211848
DEA: 112T2174
EFIS: 1116000131
DIST-CO-RTE-PM11-SD-5-R37.4 - R46.5
Award Date12/22/2016
Closeout DateNot set
Work Description(Alternative Delivery) CMGC, San Elijo Highway Bridge Replacement. Replace the San Elijo lagoon highway bridge, construct HOV lanes, construct bike and pedestrian trails and bridge, build multi-use facility at Manchester Ave.
Location DescriptionIN SAN DIEGO COUNTY IN SOLANA BEACH AND ENCINITAS FROM 0.1 MILE NORTH OF LOMAS SANTA FE DRIVE OVERCROSSING TO 0.2 MILE SOUTH OF BIRMINGHAM DRIVE OVERCROSSING
QA Service Level1 (Verified on 01/31/2017)

Sample Information

Sample Taken Date08/20/2018 Sample Unique Key3
Will the laboratory/organization for which you are a member perform testing on this material sample?No Date that the sample was received by the laboratory/organization performing the testing08/24/2018
Sample typeQuality Assurance A brief description of the sampleSize 18 HRC 410/490 Couplers
The quantity of what the sample constitutes90 From where was the sample collectedFabricator
First name of sampler or witnessed byArthur Last name of sampler or witnessed byPeterson
Title of samplerQAI Telephone number of sampler707-342-8602
Laboratory sample identification Linked DIME Sample ID
The fabricator/manufacturer/facility nameHRC Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) FormL110-096-18 Structure unique identifierNot set
Structure nameNot set

Material Information

Material TypeSMTL TM5 - Couplers Production or Authorization TestingProduction Testing
Service or UltimateUltimate Material Standard CodeASTM A706
Material Grade60 Rebar ManufacturerGerdau
Coupler ManufacturerNucor Intermediate Assembler or Fabricator
Rebar Size18 Coupler ModelHRC 410/490
Coating StandardsUncoated Shape of RebarStraight
Rebar Hoop Diameter Rebar Hoop Fabricator
Coupler Component Heat/Lot Number(s)M - NF100791673 F - NF1007791674 Rebar Heat Number(s)6503119002 6503119403
Rebar Size 2 Coupler Unique IDNot set

Test Details

DIME Sample ID: 2018-08-20-3
DIME Test ID: 2018-08-20-3-1
Testing Lab: CT HQ - Sacramento Structural Materials Testing Laboratory
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile Slip)
Test Release Date: 2018-09-03

Test Results


Number of Samples: 3
Input Type: Measured
Tester's full name: Glen Weldon
Date of test: 08/27/2018
UTM: 2000KIP
Halo ID: Large
Temperature: 70 f
NumSampleMfg. Lot Number(s)SizeArea (sqin)Slip (inch)Peak Load (lbf)Peak Stress (psi)CommentsTested By
117184.007238485096213Necking OKBrian
227184037149892875Necking OKBrian
337184037284593211Necking OKBrian

General comments (publicly viewable) (Max 1000 characters):

Test was verified on 8/27/2018