Summary for Test 2014-03-20-7408844-2

Test performed: ASTM C143-10a

Project Information

Project IdentifiersProject ID: 7780
DEA: 112T1824
EFIS: 1100020051
DIST-CO-RTE-PM11-SD-805-4.7/5.6
Award Date01/03/2013
Closeout Date09/07/2018
Work DescriptionREPLACE STRUCTURE AND CONSTRUCT DIRECT ACCESS RAMP (DAR).
Location DescriptionSAN DIEGO COUNTY IN CHULA VISTA FROM 0.4 MILE SOUTH OF EAST PALOMAR STREET OVERCROSSING TO 0.1 MILE NORTH OF NAPLES STREET UNDERCROSSING
QA Service Level1 (Verified on 12/10/2012)

Sample Information

Sample Taken Date03/20/2014 Sample Unique Key7408844
Will the laboratory/organization for which you are a member perform testing on this material sample?No Date that the sample was received by the laboratory/organization performing the testingNot set
Sample typeQuality Control A brief description of the sample6x12 concrete cylinders
The quantity of what the sample constitutes5 cylinders From where was the sample collectedSource
First name of sampler or witnessed byMalik Last name of sampler or witnessed byYusuf
Title of samplerNot set Telephone number of sampler(626) 201-5907
Laboratory sample identification2014-03-20-0740 Linked DIME Sample IDNot set
The fabricator/manufacturer/facility nameVulcan Mission Valley Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier2014-03-20-0740
Structure nameNot set

Material Information

Material TypeConcrete The concrete mix design number103612F
The truck number from where the sample was collected328 The batch plant ticket number from where the sample was collected107231
Concrete batch plantNot set The fabricator/manufacturer designation for the sampleNot set
A detailed description of where the material sample was collectedBottom of RW 316 R Station 18 plus 22 Where the material sample would have been placed if not sampledNot set
From Lot No.Not set Bag Lot No.Not set

Test Details

DIME Sample ID: 2014-03-20-7408844
DIME Test ID: 2014-03-20-7408844-2
Testing Lab: RMA Group - Rancho Cucamonga
Test Method: ASTM C143-10a: Standard Test Method for Slump of Hydraulic-Cement Concrete
Test Release Date: 2014-05-20

Test Results


Input Type: Calculated
Tester's full name: Yusuf Malik
Date of test: 03/20/2014
Slump: 4.75 inch
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 5/20/2014