Test 2014-02-25-7451171-4 (ASTM C138-10b) Summary

Project Information
Project IdentifiersProject ID: 7780
DEA: 112T1824
EFIS: 1100020051
DIST-CO-RTE-PM11-SD-805-4.7/5.6
Work DescriptionREPLACE STRUCTURE AND CONSTRUCT DIRECT ACCESS RAMP (DAR).
Location DescriptionSAN DIEGO COUNTY IN CHULA VISTA FROM 0.4 MILE SOUTH OF EAST PALOMAR STREET OVERCROSSING TO 0.1 MILE NORTH OF NAPLES STREET UNDERCROSSING
Sample Information
Sample Taken Date2/25/2014 Sample Unique Key7451171
Will the laboratory/organization for which you are a member perform testing on this material sample?No Date that the sample was received by the laboratory/organization performing the testingNot set
Sample typeQuality Control A brief description of the sample6x12 concrete cylinders
The quantity of what the sample constitutes5 Cylinders From where was the sample collectedOther
First name of sampler or witnessed bySean Last name of sampler or witnessed byAnderson
Title of samplerNot set Laboratory sample identification2014-02-25-0745
The fabricator/manufacturer/facility nameVulcan Materials - Truck 849 Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifierNot set
Structure nameNot set
Material Information
Material TypeConcrete The concrete mix design number103612F
The truck number from where the sample was collected849 The batch plant ticket number from where the sample was collected104450
Concrete batch plantMission Valley The fabricator/manufacturer designation for the sampleVulcan Materials Company
A detailed description of where the material sample was collectedRW 316R Footing Where the material sample would have been placed if not sampledNot set
From Lot No.Not set Bag Lot No.Not set
Test Details
DIME Sample ID: 2014-02-25-7451171
DIME Test ID: 2014-02-25-7451171-4
Testing Lab: RMA Group - Rancho Cucamonga
Test Method: ASTM C138-10b: Standard Test Method for Density (Unit Weight), Yield, and Air Content (Gravimetric) of Concrete
Test Release Date: 2014-03-14
Test Results

Input Type: Calculated
Tester's full name: Sean Anderson
Date of test: 02/25/2014
Identification of concrete represented by the sample: Set 1
Volume of the measure: 0.25 ft^3
Density of concrete:146 lb/ft^3
Yield of concrete:no data
Relative yield of the batch:no data
Cement content:no data
Air content:no data
General comments (publicly viewable) (Max 250 characters):

Test was verified on 03/14/2014