Summary for Test 2018-04-09-1-4

Test performed: CTM 670-December 2013

Project Information

Project IdentifiersProject ID: 211848
DEA: 112T2174
EFIS: 1116000131
DIST-CO-RTE-PM11-SD-5-R37.4 - R46.5
Award Date12/22/2016
Closeout DateNot set
Work Description(Alternative Delivery) CMGC, San Elijo Highway Bridge Replacement. Replace the San Elijo lagoon highway bridge, construct HOV lanes, construct bike and pedestrian trails and bridge, build multi-use facility at Manchester Ave.
Location DescriptionIN SAN DIEGO COUNTY IN SOLANA BEACH AND ENCINITAS FROM 0.1 MILE NORTH OF LOMAS SANTA FE DRIVE OVERCROSSING TO 0.2 MILE SOUTH OF BIRMINGHAM DRIVE OVERCROSSING
QA Service Level1 (Verified on 01/31/2017)

Sample Information

Sample Taken Date04/09/2018 Sample Unique Key1
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing04/16/2018
Sample typeQuality Assurance A brief description of the sampleno 6 9 foot dia. Welded hoop
The quantity of what the sample constitutes3 lots From where was the sample collectedFabricator
First name of sampler or witnessed byEdward Last name of sampler or witnessed byTrasoras
Title of samplerAsst METS Rep Telephone number of sampler323-594-6208
Laboratory sample identificationUnknown Linked DIME Sample IDUnknown
The fabricator/manufacturer/facility nameTNT Rebar Transportation Laboratory (TL) NumberC953644
Inspector Lot Number from the Transportation Laboratory (TL) FormUnknown Structure unique identifierNot set
Structure nameNot set

Material Information

Material TypeSMTL TM5 - Welded Hoops Production or Authorization TestingProduction Testing
Service or UltimateUltimate Rebar Heat Number(s)65028699-02
Hoop Manufacturer Lot Number(s)18 Material Standard CodeASTM A706
Material Grade60 Rebar Size6
Diameter of Hoop9'-0" Epoxy CoatedNo
Epoxy Coating ColorNA Rebar ManufacturerGerdau
Welding CompanyTNT Rebar Coating StandardsUncoated
Weld TypeFlash Welded

Test Details

DIME Sample ID: 2018-04-09-1
DIME Test ID: 2018-04-09-1-4
Testing Lab: CT HQ - Sacramento Structural Materials Testing Laboratory
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile)
Test Release Date: 2018-04-23

Test Results


Number of Samples: 1
Input Type: Measured
Tester's full name: Fred
Date of test: 04/16/2018
UTM: 400KIP
Temperature: 72 F
NumSampleMfg. Lot Number(s)SizeArea (sqin)Peak Load (lbf)Peak Stress (psi)CommentsTested By
1418#6/19mm0.444398099950Bar BrokeFred

General comments (publicly viewable) (Max 1000 characters): Bar Broke; OK Necking
Test Graph
Source: Partner Data Point File
Test graph for the Sample

Test was verified on 4/16/2018