Summary for Test 2018-02-20-17-1

Test performed: CTM 202-Oct 2014

Project Information

Project IdentifiersProject ID: 212852
DEA: 010H7604
DIST-CO-RTE-PM01-MEN-101-33.0/42.0
Award Date10/10/2017
Closeout Date08/06/2020
Work DescriptionFire Damage Repairs: Roadway Repair, Drainage/Slope Repair, Erosion Control, Fencing, MBGR and Sign Replacement, Hazard Tree and Debris Removal.
Location DescriptionNot set
QA Service Level1 (Verified on 01/26/2018)

Sample Information

Sample Taken Date02/20/2018 Sample Unique Key17
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing02/22/2018
Sample typeQuality Control A brief description of the sampleRAP - Chem 1
The quantity of what the sample constitutesrenewal From where was the sample collectedManufacturer
First name of sampler or witnessed bya Last name of sampler or witnessed bye
Title of samplerUnknown Telephone number of samplerUnknown
Laboratory sample identification61894 Linked DIME Sample IDUnknown
The fabricator/manufacturer/facility nameGranite Ukiah Transportation Laboratory (TL) NumberUnknown
Inspector Lot Number from the Transportation Laboratory (TL) FormUnknown Structure unique identifierNot set
Structure nameNot set

Material Information

Material TypeReclaimed Asphalt Pavement RAP Sourcegranite ukiah
Aggregate SizeUnknown Aggregate SourceUnknown
RAP Stockpile Stockpile Size (tons)Unknown
Reclaimed Asphalt Pavement Mix NumberNot set HMA PayNo

Test Details

DIME Sample ID: 2018-02-20-17
DIME Test ID: 2018-02-20-17-1
Testing Lab: CT D01 - District 1 Materials Laboratory
Test Method: CTM 202-Oct 2014: Method of Test for Determining Sieve Analysis of Fine and Coarse Aggregates
Test Release Date: 2018-04-06

Test Results


What size aggregate is being tested?: Combined Gradation
Input Type: Calculated
Tester's full name: Leif Ayres
Date of test: 03/30/2018
Cumulative percent passing the 2 in. sieve: 100 %
Cumulative percent passing the 1 1/2 in. sieve: 100 %
Cumulative percent passing the 1 in. sieve: 100 %
Cumulative percent passing the 3/4 in. sieve: 100 %
Cumulative percent passing the 1/2 in. sieve: 100 %
Cumulative percent passing the 3/8 in. sieve: 97.8 %
Cumulative percent passing the #4 sieve: 70.6 %
Cumulative percent passing the #8 sieve: 43.2 %
Cumulative percent passing the #16 sieve: 27.7 %
Cumulative percent passing the #30 sieve: 18.9 %
Cumulative percent passing the #50 sieve: 13.1 %
Cumulative percent passing the #100 sieve: 8.9 %
Cumulative percent passing the #200 sieve: 6 %
General comments (publicly viewable) (Max 1000 characters): rap 1

Test was verified on 3/30/2018