Test 2014-02-20-11156995-1 (ASTM C138-10b) Summary

The test has been saved successfully.
Project Information
Project IdentifiersProject ID: 10016
DEA: 06342524
EFIS: 0600000381
DIST-CO-RTE-PM06-FRE-180-R71.8/74.5
Work DescriptionNEW EXPRESS HIGHWAY
Location DescriptionFRESNO COUNTY ABOUT 6.3 MILES EAST OF FRESNO FROM 0.6 MILE WEST OF QUALITY AVENUE TO 0.2 MILE WEST OF SMITH AVENUE
Sample Information
Sample Taken Date2/20/2014 Sample Unique Key11156995
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing2/21/2014
Sample typeQuality Control A brief description of the sampleType II Cement
The quantity of what the sample constitutes10 concrete cylinders From where was the sample collectedOther
First name of sampler or witnessed byJoshua Last name of sampler or witnessed byGuilmette
Title of samplerQC Field Technician/Inspector Laboratory sample identification2014-02-20-11-15-02
The fabricator/manufacturer/facility nameMainline Bridge Deck East Bound Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifierMainline Bridge Deck E/B
Structure nameMainline Bridge Deck E/B
Material Information
Material TypeConcrete The concrete mix design numberND14505
The truck number from where the sample was collected9462 The batch plant ticket number from where the sample was collected114104987
Concrete batch plant114 The fabricator/manufacturer designation for the samplePlant
A detailed description of where the material sample was collectedMainline Bridge Deck E/B Where the material sample would have been placed if not sampledMainline Bridge Deck E/B
From Lot No.Not set Bag Lot No.Not set
Test Details
DIME Sample ID: 2014-02-20-11156995
DIME Test ID: 2014-02-20-11156995-1
Testing Lab: Trinity Engineering Laboratories, Inc. - Fresno
Test Method: ASTM C138-10b: Standard Test Method for Density (Unit Weight), Yield, and Air Content (Gravimetric) of Concrete
Test Release Date: 2014-04-09
Test Results

Input Type: Calculated
Tester's full name: Joshua Guilmette
Date of test: 02/20/2014
Identification of concrete represented by the sample: 2014-02-20-11-15-02
Volume of the measure: 0.25 ft^3
Density of concrete:145.6 lb/ft^3
Yield of concrete:9.4 yd^3
Relative yield of the batch:0.99
Cement content:7.18 lb/ft^3
Air content:1.8 %
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 04/09/2014