Summary for Test 2013-12-18-7002567-3

Test performed: CTM 211-May 2010

Project Information

Project IdentifiersProject ID: 3811
DEA: 071219U4
EFIS: 0700001829
DIST-CO-RTE-PM07-LA-5,170-58.0/63.4,R32.3/R33.1
Award Date05/06/2010
Closeout Date08/25/2016
Work DescriptionConstruct HOV lanes, connectors and replace slabs.
Location DescriptionLOS ANGELES COUNTY IN LOS ANGELES ON ROUTE 5 FROM 0.1 KM NORTH OF SHELDON STREET OVERCROSSING TO ROUTE 5/118 SEPARATION AND ON ROUTE 170 FROM 0.1 KM SOUTH OF ARLETA/SHELDON UNDERCROSSING TO ROUTE 5/170 SEPARATION
QA Service Level1 (Verified on 08/16/2012)

Sample Information

Sample Taken Date12/18/2013 Sample Unique Key7002567
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing12/18/2013
Sample typeAnnual Source Testing A brief description of the sample3/8 Rock
The quantity of what the sample constitutes4 Bags From where was the sample collectedSource
First name of sampler or witnessed byJeff Last name of sampler or witnessed byPollard
Title of samplerSupervisor of Technical Services Telephone number of samplerNot set
Laboratory sample identificationNot set Linked DIME Sample IDNot set
The fabricator/manufacturer/facility nameVulcan Sun Valley - Blvd. Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifierNot set
Structure nameNot set

Material Information

Material TypeAggregate Source Identification (SMARA, name of Pit or Job Site)91-19-0019::BOULEVARD
The fabricator's/manufacturer's product name for the sampleNot set The fabricator/manufacturer designation for the sampleNot set
The plant numberNot set A detailed description of where the material sample was collectedStockpile
Where the material sample would have been placed if not sampledNot set Primary Aggregate Nominal Size3/8 inch
The concrete mix design number Lot numberNot set
Sublot numberNot set Aggregate Mix NumberNot set

Test Details

DIME Sample ID: 2013-12-18-7002567
DIME Test ID: 2013-12-18-7002567-3
Testing Lab: CT D08 - Fontana Southern Regional Laboratory
Test Method: CTM 211-May 2010: Abrasion of Coarse Aggregate by Use of the Los Angeles Abrasion Testing Machine
Test Release Date: 2014-04-07

Test Results


How many revolutions are required?: 500 Revolution Test
Input Type: Calculated
Tester's full name: Nadar Rashidi
Date of test: 01/28/2014
Grading: C
Percent wear: 36 %
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 4/7/2014