Summary for Test 2013-10-29-10001298-2
Test performed: CTM 206-October 2011Project Information
Project Identifiers | Project ID: 3958 DEA: 07215914 EFIS: 0700001831 |
---|---|
DIST-CO-RTE-PM | 07-LA-5-1.2/2.1 |
Award Date | 12/31/1969 |
Closeout Date | 06/14/2016 |
Work Description | WIDEN AND REALIGN FREEWAY AND RECONSTRUCT OVERCROSSING STRUCTURE. |
Location Description | LOS ANGELES COUNTY IN SANTA FE SPRINGS FROM 0.3 MILE SOUTH OF NORTH FORK COYOTE CREEK BRIDGE TO 0.3 MILE NORTH OF MARQUARDT AVENUE AND AT NORWALK HUB AND LOS ANGELES REGIONAL TRANSPORTATION MANAGEMENT CENTER |
QA Service Level | 1 (Verified on 05/01/2012) |
Sample Information
Sample Taken Date | 10/29/2013 | Sample Unique Key | 10001298 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 11/20/2013 |
Sample type | Annual Source Testing | A brief description of the sample | 3/8 PCC Aggregates |
The quantity of what the sample constitutes | 4 Bags | From where was the sample collected | Source |
First name of sampler or witnessed by | Unknown | Last name of sampler or witnessed by | Unknown |
Title of sampler | Not set | Telephone number of sampler | Not set |
Laboratory sample identification | 3296B | Linked DIME Sample ID | Not set |
The fabricator/manufacturer/facility name | Robertsons - Cabazon | Transportation Laboratory (TL) Number | |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | Not set | |
Structure name | Not set |
Material Information
Material Type | Aggregate | Source Identification (SMARA, name of Pit or Job Site) | 91-33-0008::CABAZON QUARRY |
---|---|---|---|
The fabricator's/manufacturer's product name for the sample | Not set | The fabricator/manufacturer designation for the sample | Not set |
The plant number | Not set | A detailed description of where the material sample was collected | Stockpiles |
Where the material sample would have been placed if not sampled | Not set | Primary Aggregate Nominal Size | 3/8 inch |
The concrete mix design number | Lot number | Not set | |
Sublot number | Not set | Aggregate Mix Number | Not set |
Test Details
DIME Sample ID: 2013-10-29-10001298
DIME Test ID: 2013-10-29-10001298-2
Testing Lab: CT D08 - Fontana Southern Regional Laboratory
Test Method: CTM 206-October 2011: Method of Test for Specific Gravity and Absorption of Coarse Aggregate
Test Release Date: 2014-04-07
Test Results
How will the aggregate be used?: portland cement
Input Type: Calculated
Tester's full name: Nader Rashidi
Date of test: 12/13/2013
% Water Absorbed: 2.3 %
Bulk Saturated Surface Dry Specific Gravity: 2.64
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 4/7/2014 ✔