Summary for Test 2016-10-19-12-1

Test performed: AGGLP SIEVE_ANALYSIS-1

Project Information

Project IdentifiersProject ID: 212324
DEA: 033F5104
EFIS: 0313000020
DIST-CO-RTE-PM03-YUB-20-R18.1/R20.1
Award Date10/31/2019
Closeout Date08/03/2023
Work DescriptionConstruct bridge, realign curve & widen shoulders.
Location DescriptionConstruction on state highway in Yuba County near Smartsville from the Yuba River Bridge to 0.3 mile east of Smartsville Road.
QA Service Level1 (Verified on 02/27/2020)

Sample Information

Sample Taken Date10/19/2016 Sample Unique Key12
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing04/06/2017
Sample typeQuality Control A brief description of the sampleFOUNDATION INVESTIGATION
The quantity of what the sample constitutes1 bag From where was the sample collectedJob Site
First name of sampler or witnessed byJOE Last name of sampler or witnessed byKAUMP
Title of samplerUnknown Telephone number of samplerUnknown
Laboratory sample identification17SOIL-0073 Linked DIME Sample IDUnknown
The fabricator/manufacturer/facility nameNA Transportation Laboratory (TL) NumberC739518
Inspector Lot Number from the Transportation Laboratory (TL) FormUnknown Structure unique identifierNot set
Structure nameNot set

Material Information

Material TypeSoil The fabricator's/manufacturer's product name for the sampleUnknown
The fabricator/manufacturer designation for the sampleUnknown A detailed description of where the material sample was collectedRC-16-003
Where the material sample would have been placed if not sampled0 TO 11 FT

Test Details

DIME Sample ID: 2016-10-19-12
DIME Test ID: 2016-10-19-12-1
Testing Lab: CT HQ - Sacramento Aggregate Testing Laboratory
Test Method: AGGLP SIEVE_ANALYSIS-1: Soils for Corrosion Sieve Analysis
Test Release Date: 2017-04-14

Test Results


Input Type: Measured
Tester's full name: Phillip Montes
Date of test: 04/07/2017
Total mass of material in the sample: 2467 grams
Cumulative mass retained on the 2 in. sieve: 0 grams
Cumulative mass retained on the 1 1/2 in. sieve: 0 grams
Cumulative mass retained on the 1 in. sieve: 92 grams
Cumulative mass retained on the 3/4 in. sieve: 170 grams
Cumulative mass retained on the 1/2 in. sieve: 120 grams
Cumulative mass retained on the 3/8 in. sieve: 89 grams
Cumulative mass retained on the #4 sieve: 173 grams
Cumulative mass retained on the #8 sieve: 20 grams
Total sample mass passing the #4 sieve: 1822 grams
Total mass of fine material in the sample: 556 grams
Cumulative mass retained on the pan: 536 grams
Total cumulative mass of coarse aggregate: 644 grams
Total cumulative mass of fine aggregate: 556 grams
Sum of coarse and fine aggregate: 2466 grams
Percentage of coarse material: 26 %
Percentage of fine material: 74 %
Cumulative percent passing the 2 in. sieve: 100 %
Cumulative percent passing the 1 1/2 in. sieve: 100 %
Cumulative percent passing the 1 in. sieve: 96 %
Cumulative percent passing the 3/4 in. sieve: 89 %
Cumulative percent passing the 1/2 in. sieve: 85 %
Cumulative percent passing the 3/8 in. sieve: 81 %
Cumulative percent passing the #4 sieve: 74 %
Cumulative percent passing the #8 sieve: 71 %
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 4/7/2017