Summary for Test 2017-02-28-12-1

Test performed: AGGLP SIEVE_ANALYSIS-1

Project Information

Project IdentifiersProject ID: 212238
DEA: 11288824
EFIS: 1115000068
DIST-CO-RTE-PM11-SD-905,125,905-9.6/11.4
Award DateNot set
Closeout DateNot set
Work DescriptionCONSTRUCT FREEWAY TO FREEWAY CONNECTORS.
Location DescriptionSAN DIEGO COUNTY IN AND NEAR SAN DIEGO AT ROUTE 11/125/905 SEPARATION
QA Service Level1 (Verified on 03/20/2017)

Sample Information

Sample Taken Date02/28/2017 Sample Unique Key12
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing03/03/2017
Sample typeQuality Control A brief description of the sampleBRIDGE PIER FOUNDATION
The quantity of what the sample constitutes1 BAG From where was the sample collectedJob Site
First name of sampler or witnessed byJEFF Last name of sampler or witnessed byKERMODE
Title of samplerUnknown Telephone number of samplerUnknown
Laboratory sample identification17SOIL-0042 Linked DIME Sample IDUnknown
The fabricator/manufacturer/facility nameNA Transportation Laboratory (TL) NumberC585216A
Inspector Lot Number from the Transportation Laboratory (TL) FormUnknown Structure unique identifierNot set
Structure nameNot set

Material Information

Material TypeSoil The fabricator's/manufacturer's product name for the sampleUnknown
The fabricator/manufacturer designation for the sampleUnknown A detailed description of where the material sample was collectedRC-17-63706
Where the material sample would have been placed if not sampled0 TO 15 FT

Test Details

DIME Sample ID: 2017-02-28-12
DIME Test ID: 2017-02-28-12-1
Testing Lab: CT HQ - Sacramento Aggregate Testing Laboratory
Test Method: AGGLP SIEVE_ANALYSIS-1: Soils for Corrosion Sieve Analysis
Test Release Date: 2017-03-28

Test Results


Input Type: Measured
Tester's full name: Phillip Montes
Date of test: 03/21/2017
Total mass of material in the sample: 1103 grams
Cumulative mass retained on the 2 in. sieve: 0 grams
Cumulative mass retained on the 1 1/2 in. sieve: 0 grams
Cumulative mass retained on the 1 in. sieve: 0 grams
Cumulative mass retained on the 3/4 in. sieve: 0 grams
Cumulative mass retained on the 1/2 in. sieve: 0 grams
Cumulative mass retained on the 3/8 in. sieve: 9 grams
Cumulative mass retained on the #4 sieve: 38 grams
Cumulative mass retained on the #8 sieve: 6 grams
Total sample mass passing the #4 sieve: 1055 grams
Total mass of fine material in the sample: 528 grams
Cumulative mass retained on the pan: 521 grams
Total cumulative mass of coarse aggregate: 47 grams
Total cumulative mass of fine aggregate: 527 grams
Sum of coarse and fine aggregate: 1102 grams
Percentage of coarse material: 4 %
Percentage of fine material: 96 %
Cumulative percent passing the 2 in. sieve: 100 %
Cumulative percent passing the 1 1/2 in. sieve: 100 %
Cumulative percent passing the 1 in. sieve: 100 %
Cumulative percent passing the 3/4 in. sieve: 100 %
Cumulative percent passing the 1/2 in. sieve: 100 %
Cumulative percent passing the 3/8 in. sieve: 99 %
Cumulative percent passing the #4 sieve: 96 %
Cumulative percent passing the #8 sieve: 95 %
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 3/21/2017