Summary for Test 2013-07-24-5899-6

Test performed: ASTM C1064-08

Project Information

Project IdentifiersProject ID: 7780
DEA: 112T1824
EFIS: 1100020051
DIST-CO-RTE-PM11-SD-805-4.7/5.6
Award Date01/03/2013
Closeout Date09/07/2018
Work DescriptionREPLACE STRUCTURE AND CONSTRUCT DIRECT ACCESS RAMP (DAR).
Location DescriptionSAN DIEGO COUNTY IN CHULA VISTA FROM 0.4 MILE SOUTH OF EAST PALOMAR STREET OVERCROSSING TO 0.1 MILE NORTH OF NAPLES STREET UNDERCROSSING
QA Service Level1 (Verified on 12/10/2012)

Sample Information

Sample Taken Date07/24/2013 Sample Unique Key5899
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing07/25/2013
Sample typeQuality Control A brief description of the sample6x12 concrete cylinders
The quantity of what the sample constitutes4 cylinders From where was the sample collectedSource
First name of sampler or witnessed byJeff Last name of sampler or witnessed byCannon
Title of samplerNot set Telephone number of samplerNot set
Laboratory sample identification2013-07-24-09-30-8531 Linked DIME Sample IDNot set
The fabricator/manufacturer/facility nameVulcan Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifierNot set
Structure nameNot set

Material Information

Material TypeConcrete The concrete mix design number103612F
The truck number from where the sample was collectedNot set The batch plant ticket number from where the sample was collected145108
Concrete batch plantNot set The fabricator/manufacturer designation for the sampleNot set
A detailed description of where the material sample was collectedFooting Where the material sample would have been placed if not sampledNot set
From Lot No.Not set Bag Lot No.Not set

Test Details

DIME Sample ID: 2013-07-24-5899
DIME Test ID: 2013-07-24-5899-6
Testing Lab: Vulcan Materials Company - San Diego
Test Method: ASTM C1064-08: Standard Test Method for Temperature of Freshly Mixed Hydraulic-Cement Concrete
Test Release Date: 2013-11-06

Test Results


Input Type: Calculated
Tester's full name: Halden George
Date of test: 07/24/2013
Temperature: 80 F
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 11/6/2013