Test 2016-08-01-7-1 (CTM 202-November 2011) Summary

Project Information
Project IdentifiersProject ID: 210696
DEA: 080M2804
EFIS: 0800000472
DIST-CO-RTE-PM08-SBD-15-171.8/173.8
Work DescriptionBRIDGE REPLACEMENT AND WIDEN, CONC AND HMA PVMT, COLD PLANE AC PVMT.
Location DescriptionIn SBD County
Sample Information
Sample Taken Date8/1/2016 Sample Unique Key7
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing8/2/2016
Sample typeAcceptance A brief description of the sampleStructure Backfill
The quantity of what the sample constitutes2 Bags From where was the sample collectedJob Site
First name of sampler or witnessed byRene Last name of sampler or witnessed byUnknown
Title of samplerField Technician Laboratory sample identification6302B
The fabricator/manufacturer/facility nameNative Material Transportation Laboratory (TL) NumberC 974880
Inspector Lot Number from the Transportation Laboratory (TL) FormUnknown Structure unique identifierNot set
Structure nameNot set
Material Information
Material TypeSoil The fabricator's/manufacturer's product name for the sampleUnknown
The fabricator/manufacturer designation for the sampleUnknown A detailed description of where the material sample was collectedSta 85 50 to 86 25 Stockpile
Where the material sample would have been placed if not sampledUnknown
Test Details
DIME Sample ID: 2016-08-01-7
DIME Test ID: 2016-08-01-7-1
Testing Lab: CT - Southern Regional Laboratory
Test Method: CTM 202-November 2011: Method of Test for Sieve Analysis of Fine and Coarse Aggregates
Test Release Date: 2019-06-06
Test Results

What size aggregate is being tested?: Combined Gradation
Individual or cumulative mass retained on each sieve?: Cumulative Mass Retained
Input Type: Calculated
Tester's full name: Jose Guzman
Date of test: 08/08/2016
Cumulative percent passing the 3 in. sieve:100 %
Cumulative percent passing the 2 1/2 in. sieve:100 %
Cumulative percent passing the 2 in. sieve:100 %
Cumulative percent passing the 1 1/2 in. sieve:98 %
Cumulative percent passing the 1 in. sieve:96 %
Cumulative percent passing the 3/4 in. sieve:92 %
Cumulative percent passing the 1/2 in. sieve:86 %
Cumulative percent passing the 3/8 in. sieve:82 %
Cumulative percent passing the #4 sieve:70 %
Cumulative percent passing the #8 sieve:58 %
Cumulative percent passing the #16 sieve:46 %
Cumulative percent passing the #30 sieve:36 %
Cumulative percent passing the #50 sieve:27 %
Cumulative percent passing the #100 sieve:20 %
Cumulative percent passing the #200 sieve:15 %
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 05/30/2019