Test 2016-08-18-3-4 (SMTL BILST-06) Summary

Project Information
Project IdentifiersProject ID: 7285
DEA: 040120T4
EFIS: 0400000027
DIST-CO-RTE-PM04-SF-80-12.6/13.9
Work DescriptionCONSTRUCT BRIDGE, ROADWAYS, ELECTRICAL, BUILDINGS AND REMOVE BRIDGES
Location DescriptionTHE CITY AND COUNTY OF SAN FRANCISCO FROM THE YERBA BUENA TUNNEL TO 1.3 KM EAST OF THE YERBA BUENA TUNNEL
Sample Information
Sample Taken Date8/18/2016 Sample Unique Key3
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing8/18/2016
Sample typeQuality Assurance A brief description of the sampleBearing Pad
The quantity of what the sample constitutes18 From where was the sample collectedFabricator
First name of sampler or witnessed byBill Last name of sampler or witnessed byHowe
Title of samplerUnknown Laboratory sample identificationUnknown
The fabricator/manufacturer/facility nameDyna Transportation Laboratory (TL) NumberC740160
Inspector Lot Number from the Transportation Laboratory (TL) FormB10300116 Structure unique identifierNot set
Structure nameNot set
Material Information
Material TypeSMTL TM1 - Elastomeric Bearing Pad Mfg. Lot Number(s)081116
Material/Compound/Elastomer IDNA Samples Representing18
Description (size)70mm x 179mm x 320mm Comments11 Guage Shims
Description (Number of Shims)3 Type of Bearing PadSteel
Description (Thickness of Shims)NA Manufacturer(s)DynaTect
Batch NumberNA
Test Details
DIME Sample ID: 2016-08-18-3
DIME Test ID: 2016-08-18-3-4
Testing Lab: CT HQ - Sacramento Structural Materials Testing Laboratory
Test Method: SMTL BILST-06: (Neoprene Verification) Bilstein Test
Test Release Date: 2016-08-19
Test Results

Input Type: Measured
Tester's full name: Glen Weldon
Date of test: 08/19/2016
Result:Pass
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 08/19/2016