Summary for Test 2016-04-15-4-1

Test performed: CTM 202-November 2011

Project Information

Project IdentifiersProject ID: 209217
DEA: 080F5404
EFIS: 0800000136
COOP: 081468
DIST-CO-RTE-PM08-RIV-91,15-0.0/13.04, 35.64/45.14
Award Date09/09/2013
Closeout Date09/20/2023
Work DescriptionSR-91 Corridor Improvement Project: Develop approx. 8 miles of tolled express lanes and related improvements within SR 91 between the Riverside/Orange County line and I-15, including transition areas.
Location Description08-RIV-91-0.0/13.04; 12-ORA-91-R14.43/R18.91; 08-RIV-15-35.64/45.14
QA Service Level1 (Verified on 08/07/2014)

Sample Information

Sample Taken Date04/15/2016 Sample Unique Key4
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing05/18/2016
Sample typeAcceptance A brief description of the sampleClass 2 Aggregate Subbase
The quantity of what the sample constitutes1 Bag From where was the sample collectedJob Site
First name of sampler or witnessed byTom Last name of sampler or witnessed byDorsey
Title of samplerQA Tech Telephone number of samplerUnknown
Laboratory sample identification6174B Linked DIME Sample IDUnknown
The fabricator/manufacturer/facility nameUnknown Transportation Laboratory (TL) NumberC 975488
Inspector Lot Number from the Transportation Laboratory (TL) FormUnknown Structure unique identifierNot set
Structure nameNot set

Material Information

Material TypeAggregate Source Identification (SMARA, name of Pit or Job Site)Unknown
The fabricator's/manufacturer's product name for the sampleUnknown The fabricator/manufacturer designation for the sampleUnknown
The plant numberUnknown A detailed description of where the material sample was collectedRadio Yard Crusher Stockpile
Where the material sample would have been placed if not sampledUnknown Primary Aggregate Nominal Size1 inch
The concrete mix design numberUnknown Lot numberNot set
Sublot numberNot set Aggregate Mix NumberNot set

Test Details

DIME Sample ID: 2016-04-15-4
DIME Test ID: 2016-04-15-4-1
Testing Lab: CT D08 - Fontana Southern Regional Laboratory
Test Method: CTM 202-November 2011: Method of Test for Sieve Analysis of Fine and Coarse Aggregates
Test Release Date: 2019-10-15

Test Results


What size aggregate is being tested?: Combined Gradation
Individual or cumulative mass retained on each sieve?: Cumulative Mass Retained
For Combined Gradation only, has the fine aggregate sample been reduced?: No
For Combined Gradation only, use #40 Sieve?: No
Input Type: Calculated
Tester's full name: Nemencio Daof
Date of test: 05/23/2016
Cumulative percent passing the 3 in. sieve: 100 %
Cumulative percent passing the 2 1/2 in. sieve: 100 %
Cumulative percent passing the 2 in. sieve: 100 %
Cumulative percent passing the 1 1/2 in. sieve: 100 %
Cumulative percent passing the 1 in. sieve: 100 %
Cumulative percent passing the 3/4 in. sieve: 92 %
Cumulative percent passing the 1/2 in. sieve: 66 %
Cumulative percent passing the 3/8 in. sieve: 56 %
Cumulative percent passing the #4 sieve: 40 %
Cumulative percent passing the #8 sieve: 30 %
Cumulative percent passing the #16 sieve: 23 %
Cumulative percent passing the #30 sieve: 17 %
Cumulative percent passing the #50 sieve: 12 %
Cumulative percent passing the #100 sieve: 8 %
Cumulative percent passing the #200 sieve: 4 %
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 10/15/2019