Summary for Test 2016-06-30-13-1

Test performed: CTM 202-November 2011

Project Information

Project IdentifiersProject ID: 209139
DEA: 071170U4
EFIS: 0700000085
DIST-CO-RTE-PM07-LA-10-33.2/37.2
Award Date02/10/2014
Closeout Date03/01/2022
Work DescriptionCONSTRUCT HOV LANES, WIDEN BRIDGES, AND REALIGN RAMPS.
Location DescriptionLOS ANGELES COUNTY IN BALDWIN PARK AND WEST COVINA FROM 0.1 MILE WEST OF PUENTE AVENUE UNDERCROSSING TO 0.2 MILE EAST OF HOLLENBECK STREET UNDERCROSSING
QA Service Level1 (Verified on 05/06/2014)

Sample Information

Sample Taken Date06/30/2016 Sample Unique Key13
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing07/05/2016
Sample typeAnnual Source Testing A brief description of the sampleOne inch PCC Aggregate
The quantity of what the sample constitutes4 Bags From where was the sample collectedSource
First name of sampler or witnessed byChris Last name of sampler or witnessed byHindmand
Title of samplerQC Technician Telephone number of samplerUnknown
Laboratory sample identification6276B Linked DIME Sample IDUnknown
The fabricator/manufacturer/facility nameRobertsons Harlow Quarry Transportation Laboratory (TL) NumberC 16000006
Inspector Lot Number from the Transportation Laboratory (TL) FormUnknown Structure unique identifierNot set
Structure nameNot set

Material Information

Material TypeAggregate Source Identification (SMARA, name of Pit or Job Site)SMARA 91 33 0061
The fabricator's/manufacturer's product name for the sampleUnknown The fabricator/manufacturer designation for the sampleUnknown
The plant numberUnknown A detailed description of where the material sample was collectedStockpiles
Where the material sample would have been placed if not sampledUnknown Primary Aggregate Nominal Size1 inch
The concrete mix design number Lot numberNot set
Sublot numberNot set Aggregate Mix NumberNot set

Test Details

DIME Sample ID: 2016-06-30-13
DIME Test ID: 2016-06-30-13-1
Testing Lab: CT D08 - Fontana Southern Regional Laboratory
Test Method: CTM 202-November 2011: Method of Test for Sieve Analysis of Fine and Coarse Aggregates
Test Release Date: 2019-08-22

Test Results


What size aggregate is being tested?: 1 in. x No. 4 - Coarse Aggregate
Individual or cumulative mass retained on each sieve?: Cumulative Mass Retained
For Combined Gradation only, has the fine aggregate sample been reduced?: No
For Combined Gradation only, use #40 Sieve?: No
Input Type: Calculated
Tester's full name: Jose Guzman
Date of test: 07/11/2016
Cumulative percent passing the 1 1/2 in. sieve: 100 %
Cumulative percent passing the 1 in. sieve: 89 %
Cumulative percent passing the 3/4 in. sieve: 60 %
Cumulative percent passing the 1/2 in. sieve: 28 %
Cumulative percent passing the 3/8 in. sieve: 14 %
Cumulative percent passing the #4 sieve: 3 %
Cumulative percent passing the #8 sieve: 1 %
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 8/22/2019