Test 2015-09-23-27-1 (CTM 202-November 2011) Summary

Project Information
Project IdentifiersProject ID: 209918
DEA: 07274804
EFIS: 0700000516
DIST-CO-RTE-PM07-LA-18-0.2
Work DescriptionREPLACE BRIDGE DECK AND RAILING, REPAIR BENT CAPS AND COLUMNS.
Location DescriptionLOS ANGELES COUNTY AT LLANO AT COUNTY LINE OVERHEAD
Sample Information
Sample Taken Date9/23/2015 Sample Unique Key27
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing12/29/2015
Sample typeInformational A brief description of the sampleSoil for Subgrade.
The quantity of what the sample constitutesUnknown From where was the sample collectedSource
First name of sampler or witnessed byUnknown Last name of sampler or witnessed byUnknown
Title of samplerUnknown Laboratory sample identification5419B
The fabricator/manufacturer/facility nameNA Transportation Laboratory (TL) NumberUnknown
Inspector Lot Number from the Transportation Laboratory (TL) FormUnknown Structure unique identifierNot set
Structure nameNot set
Material Information
Material TypeSoil The fabricator's/manufacturer's product name for the sampleUnknown
The fabricator/manufacturer designation for the sampleUnknown A detailed description of where the material sample was collectedPhelan Rd Sta 177 50
Where the material sample would have been placed if not sampledUnknown
Test Details
DIME Sample ID: 2015-09-23-27
DIME Test ID: 2015-09-23-27-1
Testing Lab: CT - Southern Regional Laboratory
Test Method: CTM 202-November 2011: Method of Test for Sieve Analysis of Fine and Coarse Aggregates
Test Release Date: 2019-10-15
Test Results

What size aggregate is being tested?: Combined Gradation
Individual or cumulative mass retained on each sieve?: Cumulative Mass Retained
Input Type: Calculated
Tester's full name: Babak Razei
Date of test: 01/27/2016
Cumulative percent passing the 3 in. sieve:100 %
Cumulative percent passing the 2 1/2 in. sieve:100 %
Cumulative percent passing the 2 in. sieve:100 %
Cumulative percent passing the 1 1/2 in. sieve:100 %
Cumulative percent passing the 1 in. sieve:100 %
Cumulative percent passing the 3/4 in. sieve:99 %
Cumulative percent passing the 1/2 in. sieve:93 %
Cumulative percent passing the 3/8 in. sieve:90 %
Cumulative percent passing the #4 sieve:87 %
Cumulative percent passing the #8 sieve:0 %
Cumulative percent passing the #16 sieve:0 %
Cumulative percent passing the #30 sieve:0 %
Cumulative percent passing the #50 sieve:0 %
Cumulative percent passing the #100 sieve:0 %
Cumulative percent passing the #200 sieve:0 %
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 10/15/2019